Laserfiche WebLink
<br />AWD SUMMARY <br /> <br />AWD-00035 Add $ 100,000 4th Street Levee Pump Station Replacement <br />Description: <br />Begin preliminary work on soil borings, planning, and VE study for 4th Street levee pump station design. <br />Background: <br />At the November 8, 2012 Diversion Board meeting, the Board requested the USACE add levees long the Red <br />River to allow increased flow through the protected area. To allow 35 feet through town, the 4th Street <br />levee requires certification. In order to meet certification criteria, the stormwater pump stations on the <br />north end of the levee must be replaced. <br />This AWD authorizes soil borings, planning, and VE study work tasks to begin. The complete scope and fee <br />for the pump station replacement design will be included in a new Task Order No. 13, Levee Design and <br />Design Support. This task order is under development. <br />Cost incurred under this AWD is not to exceed $100,000.00. <br /> <br />TASK_ORDER_SUMMARY_2014-0213.DOCX 5