<br />HMG – Task Order No. 8 – Amendment 6 Increase $ 129,345 <br />Work-In-Kind (WIK) <br />Description – Subtask 2.E.vi: <br />MN EIS Preparation Support <br />Provide technical and engineering services to analyze the social and economic effects of the proposed <br />project and selected alternatives. Provide H&H modeling support and mapping as requested. Compile and <br />provide project descriptions and available information of completed and currently funded flood risk <br />reduction projects since FFREIS. Compile and provide county and city land use plans. <br />Background: <br />The Minnesota Department of Natural Resources (DNR) is preparing an EIS for the Fargo-Moorhead Flood <br />Risk Management Project and requires support from the Diversion Authority to complete technical studies <br />and reports for the EIS. <br /> <br />Cost budget = $ 250,000 <br /> <br />Description – Subtasks A, B, C, D, and E: <br />Previously Completed work <br />Reallocated budge remaining for completed work tasks to subtask 2.E.vi. <br />Background: <br />Work under these subtasks has been completed for less than the contract cost budgets. <br /> <br />Cost = $ -120,654 <br /> <br />Recommendation: <br />PMC recommends authorization for Task Order No. 8, Amendment 6 for $ 129,345. <br /> <br /> <br />HMG – Task Order No. 10 – Amendment 4 No Cost Change <br />Utilities Design and Identification <br />Description– Subtask 2.C: <br />Relocation Design <br />Provide relocation design documents for two (2) City of Fargo sanitary sewer force mains. <br />Background: <br />Construction of the OHB Ring Levee requires relocation of existing utilities that cross the levee. <br /> <br />Recommendation: <br />PMC recommends authorization for Task Order No. 10, Amendment 4 as a no cost change. <br /> <br />TASK_ORDER_SUMMARY_2014-0213.DOCX 4