02-13-2014
Laserfiche
>
Public
>
Flood Diversion Board of Authority
>
Agenda
>
2014
>
02-13-2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/18/2014 11:18:59 AM
Creation date
11/28/2018 2:35:22 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />HMG – Task Order No. 8 – Amendment 6 Increase $ 129,345 <br />Work-In-Kind (WIK) <br />Description – Subtask 2.E.vi: <br />MN EIS Preparation Support <br />Provide technical and engineering services to analyze the social and economic effects of the proposed <br />project and selected alternatives. Provide H&H modeling support and mapping as requested. Compile and <br />provide project descriptions and available information of completed and currently funded flood risk <br />reduction projects since FFREIS. Compile and provide county and city land use plans. <br />Background: <br />The Minnesota Department of Natural Resources (DNR) is preparing an EIS for the Fargo-Moorhead Flood <br />Risk Management Project and requires support from the Diversion Authority to complete technical studies <br />and reports for the EIS. <br /> <br />Cost budget = $ 250,000 <br /> <br />Description – Subtasks A, B, C, D, and E: <br />Previously Completed work <br />Reallocated budge remaining for completed work tasks to subtask 2.E.vi. <br />Background: <br />Work under these subtasks has been completed for less than the contract cost budgets. <br /> <br />Cost = $ -120,654 <br /> <br />Recommendation: <br />PMC recommends authorization for Task Order No. 8, Amendment 6 for $ 129,345. <br /> <br /> <br />HMG – Task Order No. 10 – Amendment 4 No Cost Change <br />Utilities Design and Identification <br />Description– Subtask 2.C: <br />Relocation Design <br />Provide relocation design documents for two (2) City of Fargo sanitary sewer force mains. <br />Background: <br />Construction of the OHB Ring Levee requires relocation of existing utilities that cross the levee. <br /> <br />Recommendation: <br />PMC recommends authorization for Task Order No. 10, Amendment 4 as a no cost change. <br /> <br />TASK_ORDER_SUMMARY_2014-0213.DOCX 4
The URL can be used to link to this page
Your browser does not support the video tag.