Laserfiche WebLink
call vote, the motion carried unanimously. <br />Regarding a second engineer's opinion on the bridge north of <br />Harwood in Sections 21 -22, Harwood Township, Mr. Eckert stated that <br />Steve Grindberg received an estimate of $3,000-$5,000 for a new study, <br />which includes core samples. Mrs. Stanton moved and Mr. Eckert <br />seconded to authorize Steve Grindberg to hire an engineer to do a <br />second study without soil borings at this time, at a cost not to exceed <br />$1,500.00. On roll call vote, the motion carried unanimously. <br />A committee report was given by Commissioner Sondrall on a meeting <br />of the Southeastern North Dakota Community Action Agency. <br />On motion by Mrs. Stanton and seconded by Mr. Eckert, the meeting <br />was adjourned. <br />