Laserfiche WebLink
rented which sucked up the water in the carpet. Vector control purchased a <br />dehumidifier to help dry the building. Vector also assisted in removing the office <br />files to expose the carpet. By Saturday noon the carpet was dry and no damage <br />to furniture was seen. County maintainance staff plumbed the pressure relief <br />valve to drain into the shower which will prevent another flood event. A sign was <br />also placed by the outside water hose valve stating: Please shut valve slowly. <br /> <br /> <br />Upcoming Events: <br /> <br />NDWCA Area 2 meeting October 22, Valley City <br />NDWCA annual conference January 8-10, 2019, Bismarck <br />