Page 2 of 2 <br /> <br />G45- $1267 <br />M45- No charge <br />E45- No charge <br />This change was initiated by the transition team to modify the privacy screen and partition doors in the shower <br />and clothing exchange area, <br /> <br />G46-$3452 <br />M46-$1399 <br />E46-$214.77 <br />This change order was initiated by the amhitect to revise the laundry area to include a fourth washer. Originally <br />only 3 washers were to have been shipped and the fourth was to have been pumhased at a later date. <br />However, the spec went through unnoticed with 4 washers and the room was subsequently modified to fit the <br />equipment, <br /> <br />G47- No charge <br />M47-$3017 <br />E47- No charge <br />This change order was initiated by the architect to install a roof drain and rain leader piping. <br /> <br />G49-No charge <br />M49- DEDUCT $2,572 <br />E49- No charge <br />This change order was initiated by the architect to remove labor and materials for caulking certain penal <br />fixtures in the plumbing contract and having the work done by the general contractor. <br /> <br />G52- No charge <br />M52- No charge <br />E52- $951.25 <br />This change order was initiated by the architect to change the installation of light fixtures from the masonry <br />walls to the suspended security ceilings. <br /> <br />The total costs for all of these change order is $16,399.02. Each of the change orders contains detailed <br />drawings if you so desire to see those materials, <br /> <br />Although, I am not happy with the slow pace at which the change orders have been sent to the county, I am <br />pleased about the relatively small number of change orders. They have been minimal with no financial <br />"surprises". <br /> <br />Please let me know if you have any questions on this information. I would like your approval to sign the <br />documents by Monday...at which time I will review the one change order that exceeds $5,000 with the Board. <br /> <br />5/1/02 <br /> <br /> <br />