c. Contract approval
Laserfiche
>
Public
>
County Commission
>
2002
>
02-04-2002
>
Consent agenda
>
c. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:13:43 PM
Creation date
1/29/2002 8:51:05 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attention: <br /> <br />Insurance Approvals <br />Engineering Services <br />The Burlington Northern Santa Fe Railway Company <br />4515 Kansas Avenue <br />Kansas City, Kansas 66106 <br /> <br /> (g). The certificate of insurance shall guarantee that the policies will not be amended, altered, modified or <br />canceled in so fur as the coverage contemplated hereunder is concerned, without at least thirty (30) days notice mailed by <br />registexed mall to Railway. <br /> <br /> (h). Full compensation for all premiums which the Contractor is required to pay on ~ the insurance described <br />he~einafte~ shall be considered as included in the prices paid for the various items of work to be performed under the <br />Contract, and no additional allowance will be made therefor or for additional premiums which may be required by <br />extensions of the policies of insurance. <br /> <br />(i). Limited seepage, pollution, and contamination coverage endorsement wording. <br /> <br />In considexation of the premium churged it is understood and agreed that Exclusion f. of Section 1. of' this <br />Policy shall not apply to the liability of the Insured resulting from seepage and/or pollution and/or <br />contamination caused solely by: <br /> <br />(1). unintended fire, lightning or explosion: or <br /> <br />(2). a collision or overturning of a road vehicle: or <br /> <br />(3). a collision or overturning or derailment of a train. <br /> <br />Notwithstanding the foregoing it is agreed that the coverage provided by this Endorsement shall not apply <br />to: <br /> <br />1. loss of, damage to or loss of use of property directly or indirectly resulting from sub-surfaee <br />operations of the insured, and/or removal of, loss of or damage to sub-surface oil, gas or any <br />other substance; <br /> <br />2. any site or location used in whole or in part for the handling, processing, <br />treatment, storage, disposal or dumping of any waste materials or substances; <br /> <br />3. the cost of evaluating and/or monitoring and/or controlling seeping and/or <br />polluting and/or contaminating substances; <br /> <br />4. the cost of removing and/or nullifying and/or cleaning up seeping and/or polluting and/or <br />contaminating substances on property at any time owned and/or leased and/or rented by the <br />insured and/or under the control of the Insured. <br /> <br />Notwithstanding the foregoing, Item 1 does not apply to tunnels. <br /> <br />It is further distinctly understood and agreed by the Contractor that its liability to the Railway herein under SECTION 1 <br />will not in any way be limited to or affected by the amount of insurance obtained and camed by the Contractor in <br />connection with said Contract. <br /> <br />SECTION 2. PROTECTION OF RAILWAY FACILITIES AND RAILWAY FLAGGER SERVICES <br /> <br /> (a). The Contractor shall give a minimum of at least thirty (30) working days notice to John Ro,zman, the <br />Railways Roadmaster at telephone ?m-aaT-6aas , in advance of when flagging services will be required to bulletin the <br /> <br />February 11, 2000 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.