e. Contract approval
Laserfiche
>
Public/Website
>
County Commission
>
2005
>
04-04-2005
>
Consent agenda
>
e. Contract approval
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/5/2005 9:28:34 AM
Creation date
3/29/2005 1:17:31 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
153
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Item No. 11 <br /> <br />Item No. 12 <br /> <br />Item No. 13 <br /> <br />Item No. 14 <br /> <br />CMP - 18"16 GAGE The unit price bid shall be considered full compensation for <br />furnishing all labor, materials, and equipment necessary to furnish and install one <br />(1) linear foot of new 18" CMP 16 gage as called for in and in accordance with <br />the plans and specifications. This work shall include, but not be limited to, <br />protecting existing utilities, excavating, preparing and grading of sub grade, <br />furnishing and installing aggregate material for bedding and encasement, <br />furnishing and installing pipe, backfilling, compacting and grading. Final payment <br />shall be based on field measurement along the invert of the pipe. <br /> <br />CULVERT. REINSTALLED SALVAGED The unit price bid shall be considered <br />full compensation for furnishing all labor, materials, and equipment necessary to <br />install one (1) linear foot of used CMP culvert as called for in and in accordance <br />with the plans and specifications. This work shall include, but not be limited to, <br />protecting existing utilities, excavating, preparing and grading of sub grade, <br />furnishing and installing aggregate material for bedding and encasement, <br />installing pipe, backfilling, compacting and grading. Final payment shall be <br />based on field measurement along the invert of the pipe. <br /> <br />SEEDING The unit price bid shall be considered full compensation for furnishing <br />all labor, materials, and equipment necessary to fertilize, drill seed, and mulch <br />one (1) square yard of area necessarily damaged by construction as called for in <br />and in accordance with the plans and specifications. This work shall include, but <br />not be limited to, protecting existing utilities, removing debris, grading, providing <br />a 4" topsoil seed bed, scarifying topsoil to be seeded, furnishing and installing <br />seed, fertilizer, and mulch, and watering area. Final payment shall be based on <br />field measurements of properly seeded areas where growth has been <br />established. Partial payment (75%) shall be made for areas where seed has <br />been properly installed, but growth has not been established yet. invoices from a <br />certified testing company. <br /> <br />MATERIAL TESTING The unit price bid shall be considered full compensation <br />for furnishing all labor, materials, and equipment necessary to provide material <br />testing on a lump sum basis as called for in and in accordance with the plans and <br />specifications. This work shall include, but not be limited to, contracting with a <br />certified testing laboratory, notifying testing laboratory of work progress and <br />scheduling tests, getting test results to the engineer, rescheduling failing tests, <br />forwarding invoices of testing laboratory. Final payment shall be based on <br />invoices from a certified testing company. Any failing tests shall not be eligible <br />for payment and shall be paid by the contractor. <br /> <br />3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.