Laserfiche WebLink
<br />Summary Sheet <br />Vector Control Flclllty Option 6 <br /> <br />General Conditions <br /> <br />$37,891,00 <br /> <br />1/20/2005 <br /> <br />Site Work <br /> <br />$34,500,00 <br />$46,535,00 <br /> <br />Concrete <br /> <br />Masonry <br /> <br />$47,360,00 <br /> <br />Metals <br /> <br />$15,293.00 <br /> <br />Wood & Plastic <br /> <br />$41,099.00 <br /> <br />Moisture Protection <br /> <br />$36,330,00 <br /> <br />Doors/Frames <br /> <br />$29,620.00 <br /> <br />Finishes <br /> <br />$82,95000 <br /> <br />Speclalliøs <br /> <br />$16,440,00 <br /> <br />Equipment <br /> <br />$2,000,00 <br /> <br />Furnishings <br /> <br />$0.00 <br /> <br />Special Construction <br /> <br />$0.00 <br /> <br />Conveying Systems <br /> <br />$0,00 <br /> <br />Fire Protection <br /> <br />$0.00 <br /> <br />Mechanlcai <br /> <br />$96,900,00 <br /> <br />Electrical <br /> <br />Subtotal <br />O&P <br /> <br />10% <br /> <br />~o.oo <br /> <br />$541.416.00 <br />$54,141.00 <br /> <br />Total Construction Estimate <br /> <br />$595,SS9.00 <br />