3. Vector Control bldg revision
Laserfiche
>
Public
>
County Commission
>
2005
>
02-07-2005
>
Regular agenda
>
3. Vector Control bldg revision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/7/2005 4:13:57 PM
Creation date
2/1/2005 10:27:48 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASS COUN1Y <br />GOVERNMENT <br />..I.. <br /> <br />Highway <br />Department <br /> <br />Keith D. Berndt, P.E. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Thomas B. Soucy, P.E. <br />Design and Construction <br />Supervisor <br /> <br />1201 West Main Avenue <br />P.O. Box 698 <br />West Fargo, North Dakota <br />58078-0698 <br /> <br />701-298-2370 <br />Fax 701-298-2395 <br /> <br />RECEIVED <br /> <br />FEB <br /> <br />1 2005 <br /> <br />CABS COUNTY COMMISSION <br /> <br />MEMORANDUM <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />Keith Berndt, Cass County Engineer ~ <br /> <br />FROM: <br /> <br />DATE: <br /> <br />January 25, 2005 <br /> <br />SUBJECT: <br /> <br />Agenda topic for February 7,2005 Commission Meeting: <br />Vector Building Addition <br /> <br />Following the January 3, 2005 Commission meeting, I asked the Architect <br />to prepare a revised floor plan and cost estimate for the Vector Building. <br />The revision incorporates additional space for engineering material testing <br />and survey equipment storage. <br /> <br />The architect revised the layout accordingly. The estimated cost for the <br />revised layout is $595,559 compared to the original cost of$535,251 or an <br />increase of about $60,000. <br /> <br />SUGGESTED MOTION: Approve the revised floor plan and solicitation <br />of bids for the construction of an addition to the highway department <br />building and for the construction of a chemical storage facility. <br /> <br />JlAdmin-Eng\Conuni"ion Co"'pl2005 ComnU"ion CoIT"pondenc'lAsonda Memo Fo, YectO! Building Addition 020705.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.