Laserfiche WebLink
<br />Keith D. Berndt, P.E. <br />October 25, 2004 <br />Page 2 <br /> <br />II. <br /> <br />III. <br /> <br />v. <br /> <br />IV. <br /> <br />Surveying <br /> <br />A. <br />B. <br /> <br />Establish control and bench marks as required. <br /> <br />Perform topographic survey at structure site. (Initial topo is done, additional <br />survey will be required for the approach roadway realignments as requested <br />by the Township). <br /> <br />Perform structure, road, and river cross-sections and profile, as required. <br /> <br />C. <br /> <br />Technician (CAD) <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br /> <br />Enter and plot existing profiles, topography, and cross-sections. <br />Calculate excavation and embankment quantities. <br />Calculate riprap erosion protection quantities. <br />Calculate structure and surfacing quantities. <br />Draw preliminary and final structure plans with details. <br />Print and plot plans. <br />Prepare exhibits required for Corps 404 permit application (if required.) <br /> <br />Clerical <br /> <br />A. <br />B. <br />C. <br /> <br />Type notes for plans. <br />Type correspondence with agencies. <br />Copy documentation. <br /> <br />Other (Mileage, Materials, and Supplies) <br /> <br />A. <br />B. <br /> <br />All mileage for engineers and survey crews on the project. <br />Miscellaneous material, supplies, and printing. <br /> <br />County responsibilities are as follows: <br /> <br />A. <br />B. <br />C. <br />D. <br />E. <br /> <br />Solicitation of Views and Clearances <br />Structure/Road Project Concept Report <br />Corps 404 Permit, Southeast Cass Water Resource District Permit <br />Right-of-way plats and contracts as necessary. <br />Geotechnical report for slope stability and foundation recommendations <br />