Amended items
Laserfiche
>
Public
>
County Commission
>
2004
>
11-01-2004
>
Amended items
>
Amended items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:15:19 PM
Creation date
11/1/2004 11:27:41 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />October 25,2004 <br /> <br />Houston EnginlJlJPing, Inc. <br /> <br />2505 N, University Dr., Box 5054 <br /> <br />Fargo, NO 58105-5054 <br /> <br />Ph 701-237-5065 <br /> <br />Fax 701-237-5101 <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />Keith D. Berndt, P.E. <br />Cass County Engineer <br />Cass County Highway Department <br />PO Box 698 <br />West Fargo, ND 58078 <br /> <br />SUBJECT: <br /> <br />Dear Mr. Berndt: <br /> <br />Preliminary Engineering Services for Project No. TB0503 <br />Sections 29/30 Everest Township <br />Bridge Replacement, Bridge No. 120-29.0 <br /> <br />Thank you for giving our firm the opportunity to perform the preliminary engineering for the <br />above listed structure replacement. Enclosed herewith is a listing of the responsibilities, as we <br />understand the project, and a fee proposal. <br /> <br />Houston Engineering responsibilities are as follows: <br /> <br />1. <br /> <br />Engineering <br /> <br />A. <br /> <br />B. <br />C. <br />D. <br />E. <br />F. <br />G. <br />H. <br />1. <br />J. <br />K. <br />L. <br /> <br />Analyze hydraulics for the Buffalo Creek crossing alternatives and perform scour <br />calculations. (Previously completed) <br />Attend TSL, PS & E and Preconstruction meetings. <br />Set grades and establish profile. <br />Set grades for new road and structure approaches <br />Prepare preliminary road/structure design plans. <br />Prepare final road/structure design plans. <br />Prepare design of railings (if necessary). <br />Prepare construction details. <br />List traffic control devices, if required. <br />Provide input for specifications and bid documents for project. <br />Shop drawing review. <br />Coordinate engineering services. <br /> <br />."ì <br />;;::'-\~"-f:" Ü f\;'q <br />',¡"\\\bl:.--' ""----"",;',\\\ <br />'1,1,-'-- ,j í <br />\ i,.;f< r : \ :, ¡ <br />I-'" ¡ I\I} 1\ <br />\\\' \,: "\('-;' ';' l~ \..::...J <br />U l.'\ 1,;1",: '.' ~ <br /> <br />L <br />Cþ..SS CO HIGHWAY OEPl <br /> <br />. Maple Grove, MN 55369-5400 <br />. Bismarck, NO 58501-4012 <br /> <br />. Ph, 763-493-4522 . Fax, 763-493-5572 <br />. Ph 701-323-0200 . Fax: 701-323-0300 <br /> <br />Minneapolis Otflce . 10900 73rd Ave, N" Suite 1 06 <br />Bismarck Office. 304 East Rosser Avenue, Suite 220 <br /> <br />Equill Opportllnitv EmplOV8r <br /> <br />wwwhollstonengineeringinc,com <br />
The URL can be used to link to this page
Your browser does not support the video tag.