Laserfiche WebLink
<br />09/22104 <br /> <br />16:43 <br /> <br />fr1 701 237 4711 <br /> <br />GRANTS MECHANICA <br /> <br />f4J 002 <br /> <br />. Mechanical Construction <br /> <br />1. Furnish and install new cast iron waste and vent piping connecting to existing <br />piping for new restroom. <br />2. Furnish and install Type L copper water piping connecting to existing piping for <br />new restroom. <br />3. Furnish and install wall hung flush valve style water closet with wall carrier. <br />4. Furnish and install wall hung lavatory with ADA trim and wall carrier. <br />5. Furnish and install thermal pipe insulation for the domestic water pipe. <br />6. HVAC will remain as is in the space. <br /> <br />The following items are excluded in the proposal: <br /> <br />. All plumbing fixtures are equipped with standard hardware, no vandal proof hardware. <br /> <br />The above listed work can be done for a cost not to exceed $7,256.00 <br /> <br />Respectfully Submitted, <br /> <br />M~?t <br /> <br />~ <br /> <br />Matt Hanson <br /> <br />Equal Opportunìty Employer <br />Page: 2 <br />