3. Prisoner holding/restroom
Laserfiche
>
Public
>
County Commission
>
2004
>
10-01-2004
>
Regular agenda
>
3. Prisoner holding/restroom
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:15:15 PM
Creation date
9/24/2004 9:30:35 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />09/22104 <br /> <br />16:43 <br /> <br />fr1 701 237 4711 <br /> <br />GRANTS MECHANICA <br /> <br />f4J 002 <br /> <br />. Mechanical Construction <br /> <br />1. Furnish and install new cast iron waste and vent piping connecting to existing <br />piping for new restroom. <br />2. Furnish and install Type L copper water piping connecting to existing piping for <br />new restroom. <br />3. Furnish and install wall hung flush valve style water closet with wall carrier. <br />4. Furnish and install wall hung lavatory with ADA trim and wall carrier. <br />5. Furnish and install thermal pipe insulation for the domestic water pipe. <br />6. HVAC will remain as is in the space. <br /> <br />The following items are excluded in the proposal: <br /> <br />. All plumbing fixtures are equipped with standard hardware, no vandal proof hardware. <br /> <br />The above listed work can be done for a cost not to exceed $7,256.00 <br /> <br />Respectfully Submitted, <br /> <br />M~?t <br /> <br />~ <br /> <br />Matt Hanson <br /> <br />Equal Opportunìty Employer <br />Page: 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.