3. Prisoner holding/restroom
Laserfiche
>
Public
>
County Commission
>
2004
>
10-01-2004
>
Regular agenda
>
3. Prisoner holding/restroom
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:15:15 PM
Creation date
9/24/2004 9:30:35 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />09/22104 <br /> <br />16:42 <br /> <br />ft1 701 237 4711 <br /> <br />GRANTS MECHANI CA <br /> <br />f4JOO1 <br /> <br />! <br /> <br /> <br />Shipping Address: <br /> <br />3239 South 15th Street <br />Fargo. ND 58104 <br />PO Box 7128 <br />Fargo, ND 58106 <br />(701) 232-8891 <br />(701) 237-4711 <br /> <br />Gnßd1¡ <br />MFØIANICAL <br /> <br />Mailing Address: <br /> <br />Telephone: <br />Fax: <br /> <br />MEMORANDUM <br /> <br />TO: <br />COMPANY: <br />RE: <br /> <br />Glenn Ellingsberg DATE; <br />Cass County Sheriff's Offiçe FROM: <br />Cass County Courthouse Holding Area TOTAL # OF PAGES: <br />Restroom <br /> <br />September 22, 2004 <br />Matt Hanson <br />2 <br /> <br />COMMENTS: <br /> <br />Glenn, <br />This fax is to serve as a proposal to install a restroom in the lower level prisoner holding <br />area of the Cass County Courthouse. <br /> <br />The following items are included in the proposal: <br /> <br />. General Construction <br /> <br />1. Remove existing carpet flooring in the room. <br />2. Prepare and paint floor to match existing floor tile In the holding area. <br />3. Modify lower base cabinets in the break area to allow for plumbing connection. <br />4. Install a new plumbing chase wall. <br />5. Sheetrock, tape and paint to match chase wall. <br />6. Furnish and install ADA grab bars. <br />7. Modify ceiling tile and grid to accommodate new chase wall. <br /> <br />. Electrical Construction <br /> <br />1. Eliminate three outlets on the north wall of room. <br />2. Modify existing outlets on south wall to be GFI rated. <br /> <br />Equal Opportunity Employer <br />Page: 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.