Laserfiche WebLink
CASS COUNTY <br /> GOVERNMENT <br /> RECEIVED <br /> MEMORANDUM AUG 2 5 ?Pirb <br /> Highway <br /> 3S COUNTY C(1%.,;, ; <br /> Department TO: Cass County Commission <br /> Jason Benson,P.E. FROM: Jason Benson, Cass County Engineer <br /> County Engineer 41r- <br /> DATE: August 21, 2014 <br /> Richard S.Sieg <br /> Superintendent <br /> SUBJECT: Consent Agenda Item for September 2, 2014 Commission <br /> Meeting: Sections 28/29 Maple River Township Bridge Field <br /> Thomas B.Soucy,P.E. Survey and Hydraulic Analysis. <br /> Design and Construction <br /> Engineer <br /> Attached is the Engineering Service Agreement for Houston Engineering, <br /> Inc. to complete a field survey and hydraulic analysis of the bridge located <br /> in sections 28/29 of Maple River Township on the Maple River. A slide <br /> area is starting to affect the south abutment of the bridge. In light of other <br /> ongoing slides in the county, I am requesting this work to be completed so <br /> we can more appropriately identify solutions before any significant failures <br /> occur. Funding for this is allocated under our Engineering line item for <br /> unanticipated design/studies. The estimated cost of this work is $7,469.00 <br /> per the attachment. <br /> SUGGESTED MOTION: Authorize chair to sign the engineering services <br /> agreement for Houston Engineering, Inc. To complete a Field Survey and <br /> Hydraulic Analysis on the bridge located in Sections 28/29 of Maple River <br /> Township on the Maple River. <br /> 1201 Main Avenue West <br /> West Fargo,North Dakota <br /> J.Adinin-Eng Commission Corrsp 2014 Commission Correspondence Consent Agenda Memo Houston Engineering TBl 101 <br /> 58078-1301 082114.doc <br /> 701-298-2370 <br /> Fax: 701-298-2395 <br />