Laserfiche WebLink
Landscaping <br /> A three-row vegetative buffer planting shall be provided to exceed the minor subdivision <br /> requirement. <br /> Sanitary Wastewater Treatment and Water Supply <br /> On-site septic systems will be utilized for the sanitary wastewater treatment system, along with <br /> check valves to prevent backup during possible water inundation. Soil testing will be completed <br /> when the weather permits prior to development. The water supply will be served by Cass Rural <br /> Water District. <br /> Agency Comments <br /> Documentation has been received from: <br /> Cass Rural Water District on 11-19-2013 stating "they have no concerns for the plat of Job <br /> Second Subdivision in the NE' of Section 35 in Pleasant Township." <br /> The County Sanitarian on 02-19-2014 stating "there are no soil tests on record for the Job <br /> Second Subdivision. Soil tests for the individual lots would be required before any on-site <br /> sewage treatment systems could be installed." <br /> Southeast Cass Water Resource District on 02-24-2014 stating that"the final plat is located <br /> within the proposed staging area of the Metro Flood Diversion Project." <br /> Century Link on 03-17-2014 stating the "above mentioned plat looks good from Century Link's <br /> standpoint". <br /> Recommendation: <br /> To approve the Final Plat as presented and recommend approval to the County Commission of <br /> the proposed subdivision plat, Job Second Subdivision, as the proposal is consistent with the <br /> Comprehensive Plan, the Subdivision Ordinance, the Flood Damage Prevention Ordinance, and <br /> all other applicable requirements. <br /> Page 2 of 2 <br />