2023-12-19
Laserfiche
>
Public
>
Water Resource Districts
>
Rush River
>
Minutes
>
2023
>
2023-12-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/16/2024 1:25:48 PM
Creation date
1/16/2024 1:25:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> <br />MINUTES OF VIRTUAL / CONFERENCE CALL SPECIAL MEETING <br />RUSH RIVER WATER RESOURCE DISTRICT <br />ORIGINATING AT THE CASS COUNTY COURTHOUSE <br />FARGO, NORTH DAKOTA <br />DECEMBER 19, 2023 <br /> <br /> <br />A virtual / conference call special meeting of the Rush River Water Resource District was <br />held on December 19, 2023, at 9:00 a.m. <br /> <br />Present were William A. Hejl, Chairman; Richard Sundberg, Manager; Jacob Gust, <br />Manager; Carol Harbeke Lewis, Secretary-Treasurer; Nina Stone, Accountant; Melissa <br />Hinkemeyer, Administrative Assistant; Sean M. Fredricks, Ohnstad Twichell, P.C.; Alexa <br />Ducioame and Brady Woodard, Moore Engineering, Inc.; Mike Opat, Houston <br />Engineering, Inc.; Duane Breitling, Cass County Commissioner; and Jim Krogh, Raymond <br />Township property owner. <br /> <br />Agenda <br />It was moved by Manager Sundberg, seconded by Manager Gust and unanimously <br />carried to approve the order of the agenda, as presented. <br /> <br />Minutes <br />It was moved by Manager Gust, seconded by Manager Sundberg and unanimously <br />carried to approve the minutes of the November 21, 2023, meeting. <br /> <br />Metro Flood Diversion Project update <br />Brady Woodard showed drone photos and updated the Board on the construction of the <br />Metro Flood Diversion Project in Rush River Water Resource District. Mr. Woodard noted <br />Drain #29 has been connected to the Diversion Channel of the Metro Flood Diversion <br />Project. Discussion was held on dewatering of the Diversion Channel and Associated <br />Infrastructure during the 2024 spring melt. Mr. Woodard said the P3 developer has <br />indicated they will not impede the flow of water through the project during spring melt. <br />Moore Engineering, Inc. will remain in contact with the P3 developer during project <br />construction. <br /> <br />Jim Krogh discussed concerns regarding the spring melt and road closures related to the <br />Metro Flood Diversion Project construction. Property owners with concerns or questions <br />regarding the design and construction of the Metro Flood Diversion Project can contact <br />Tom Fuchs at the Metro Flood Diversion Authority. <br /> <br />Metro Flood Diversion Project transitions <br />Alexa Ducioame said the transition between the Metro Flood Diversion Project and Drain <br />#2 (Lower Rush River) is ready for design work. The transition between the Metro Flood
The URL can be used to link to this page
Your browser does not support the video tag.