2022-09-01
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2022
>
2022-09-01
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/13/2022 4:37:56 PM
Creation date
10/13/2022 4:37:55 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br /> <br /> MINUTES OF VIRTUAL / CONFERENCE CALL MEETING <br /> MAPLE RIVER WATER RESOURCE DISTRICT <br />ORIGINATING AT THE CASS COUNTY HIGHWAY DEPARTMENT <br />WEST FARGO, NORTH DAKOTA <br />SEPTEMBER 1, 2022 <br /> <br /> <br />A virtual / conference call meeting of the Maple River Water Resource District was held <br />on September 1, 2022, at 8:00 a.m. <br /> <br />Present were Rodger Olson, Chairman; Gerald Melvin, Manager; Chad Miller, Manager; <br />Carol Harbeke Lewis, Secretary-Treasurer; Nina Stone, Accountant; Melissa <br />Hinkemeyer, Administrative Assistant; Sean Fredricks, Ohnstad Twichell, P.C.; Kurt <br />Lysne, Alexa Ducioame and Brady Woodard, Moore Engineering, Inc.; Mike Opat, <br />Houston Engineering, Inc.; Duane Breitling, Cass County Commissioner; Tom Soucy, <br />Cass County Highway Department; Calson Ekwen and Temiloluwa Ajayi, Minnesota <br />State University Moorhead students. <br /> <br />Agenda <br />It was moved by Manager Melvin, seconded by Manager Miller and unanimously carried <br />to approve the order of the agenda, as presented. <br /> <br />Minutes <br />It was moved by Manager Melvin and seconded by Manager Miller to approve the minutes <br />of the August 4, 2022, meeting. Upon roll call vote, the motion carried unanimously. <br /> <br />Upper Swan Creek Channel Improvement Project No. 2020-01 <br />Brady Woodard reported the contractor for Upper Swan Creek Channel Improvement <br />Project No. 2020-01 has stripped topsoil and removed trees this week in preparation to <br />begin work on the channel within the next few weeks. <br /> <br />Sean Fredricks stated the right of way Easements acquired for the Upper Swan Creek <br />Channel Improvement Project No. 2020-01 supersede the existing right of way <br />Easements in the project area regarding the Upper Swan Creek Channel. The existing <br />Easements are no longer needed and can be released. <br /> <br />It was moved by Manager Miller and seconded by Manager Melvin to approve and <br />authorize the Chairman to sign a Release of Easement involving the following property <br />owners regarding the Swan Creek Channel: <br />• Beatrice Vining <br />• Cass County Wildlife Club <br />• Dallas Nesemeier <br />• James Nesemeier
The URL can be used to link to this page
Your browser does not support the video tag.