1. Vector/Weed bldg options
Laserfiche
>
Public
>
County Commission
>
2004
>
08-02-2004
>
Regular agenda
>
1. Vector/Weed bldg options
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2004 2:15:05 PM
Creation date
7/26/2004 3:58:32 PM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />OPTION #2 <br /> <br />. <br /> <br />New Vector Control and Weed Control facility; Main Building 4,980 S. F. and Storage <br />Building 1.092 S. F. located south of the Cass County Highway Department Facility <br />adjacent to the vehicle storage building. <br /> <br />Construction Type: <br />Load bearing studs with masonry veneer at office structure and masonry <br />construction at storage structure with exterior masonry. Wood roof trusses with <br />%" plywood sheathing and asphalt shingle. <br /> <br />Option Advantages: <br />a Adjacent to vehicle storage. <br />a Isolation of Vector and Weed Control activities. <br /> <br />Option Disadvantages: <br />a Remote location of large group meeting room for use by Cass County Highway <br />Department staff. <br />a Isolation of Vector and Weed Control staff from main Cass County facility.. <br /> <br />Estimate: <br />Total Option #2: 801,676.00 (See attached estimate summary sheet) <br /> <br />OPTION #3 <br /> <br />. <br /> <br />New Vector Control Storage Building and Loading /Wash-down Area; 1,092 S.F. located <br />south of the Cass County Highway Department Facility adjacent to the vehicle storage <br />building. <br /> <br />Construction Type: <br />Load bearing masonry walls with masonry veneer. Wood roof trusses cover with <br />%" plywood sheathing and asphalt shingle. Epoxy paint throughout interior <br />surfaces for ease of cleaning. Epoxy painted Gypsum board ceiling throughout. <br /> <br />Option Advantages: <br />a Economy of construction cost. <br />0 Provides required material storage, loading and wash-down areas, and worker <br />safety. <br />0 located adjacent to vehicle storage facility. <br /> <br />Option Disadvantages: <br />0 Program requirements not provided: staff locker room, limited worker safety <br />facilities, offices, lab and meeting/lunch room provided. <br /> <br />Estimate: <br />Total Option #3: $186,144.00 (See attached estimate summary sheet) <br /> <br />Prepared by <br />1. L. Stroh Architect's and Interiors, LTD. <br />313 N.P. Avenue <br />Fargo, N.D. 58102 <br />Ph: 701-239-4198 <br /> <br />Fax: 701-239-9643 <br />
The URL can be used to link to this page
Your browser does not support the video tag.