5a. Update on-site septic regulations
Laserfiche
>
Public
>
County Commission
>
2015
>
07-20-2015
>
Regular agenda
>
5a. Update on-site septic regulations
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/30/2015 3:39:34 PM
Creation date
8/7/2015 9:37:00 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />30 <br />day’s sewage flow or 100 gallons, whichever <br />is greater. <br /> <br /> 5. An alarm device shall be installed to warn of <br /> pump failure. <br /> <br />B. FINAL TREATMENT AND DISPOSAL <br /> <br />1. General - Final treatment and disposal of all sewage tank <br />effluent shall be approved by the Health Officer or designated <br />Health Officer. <br /> <br /> Standard System <br /> <br /> a. Sizing <br /> <br /> 1. The required soil treatment area shall be <br />determined by number of bedrooms for <br />dwellings, the sum of the areas required for <br />each individual unit for multiple residential <br />units, and by the daily sewage flow for other <br />establishments. <br /> <br /> 2. The minimum soil treatment area required for <br />any dwelling shall provide at least 2 <br />bedrooms. <br /> <br /> 3. Estimates of sewage flow for dwellings are <br />given in Table III. <br /> <br />TABLE III <br />Number of <br />Bedrooms <br />Sewage Flow <br />(Gallons per Day) <br />2 300 <br />3 450 <br />4 600 <br />5 750 <br />6 900 <br />
The URL can be used to link to this page
Your browser does not support the video tag.