CASS COUNTY HIGHWAY DEPARTMENT
<br />CONTRACT
<br />This agreement made and entered into by Cass County, North Dakota, party of the first part, and Central Specialties, Inc., 6325
<br />County Road 87 SW, Alexandria, MN 56308 party of the second part (hereinafter called Contractor), WITNESSETH:
<br />1. That for and in consideration of the payments to be made by the party of the first part, the contractor promises and agrees to
<br />furnish and deliver all labor, equipment, and materials, and to pay or cause to be paid as they become due, all claims for any work, labor,
<br />materials, equipment, including equipment rental or repair, and other supplies or insurance premiums, all of which are attributable to or
<br />utilized in and about the improvement and construction of Proj ect Number CH0801 and CH0902. In accordance and in conformity with
<br />the provisions of this contract and bond, the project proposal, the standard specification, supplemental specifications, special provisions,
<br />and the limits of the prof ect as shown in the plans approved by Cass County's Engineer February 18, 2009, a length of 2.832 miles, the
<br />originals of which are on file at the Cass County Highway Department, and all of which are hereby made a part of this agreement as fully
<br />and to the same effect as if the same had been set forth in the body of this agreement. References in the Standard Specifications for
<br />Road and Bridge Construction, 2008 edition, to the North Dakota Department of Transportation or Department must be construed as
<br />referring to the owner. Likewise, a reference by the same works to engineer or director must be construed as referring to the owner of
<br />the project.
<br />2. The party of the first part agrees and promises to pay to the Contractor for said work, when completed and accepted in
<br />accordance with the provisions of this contract, the price set forth in the said proposal, amounting approximately to Five Hundred Forty-
<br />One Thousand Two Hundred Seventy-Eight and 42/100 ($541,278.42), payments to be made as provided in said specifications upon
<br />presentation of the proper certificates of the County Engineer, or his representatives, and under the terms of this contract.
<br />3. The said work shall be done in accordance with the terms of this contract, and the laws of the State of North Dakota, under
<br />direct supervision and to the entire satisfaction of the County Highway Department, subject at all times to the inspection and approval of
<br />the engineer.
<br />4. The decision of the engineer upon questions connected with the execution of this agreement or any failure or delay in the
<br />prosecution of the work by the Contractor shall be fmal and conclusive.
<br />5. In the employment of labor, other things being equal, preference shall be given to honorably discharged Veterans of the
<br />Armed Forces, and bona fide North Dakota residents, as determined by NDCC Section 43-07-20.
<br />6. The Contractor shall begin construction work when so ordered by the Cass County Highway Department and shall maintain
<br />at all times thereon a maximum and efficient working force necessary to complete the work within the time established by this contract.
<br />IN WITNESS THEREOF, the parties to this contract have set their hands and seal this +y~ day of ~~~ 1 ~ 2009.
<br />CASS COUNTY NORTH DAKOTA
<br />WITNESS TO CONTRACTOR'S SIGNATURE
<br />Chairman, Cass County Board of Commissioners
<br />Contractor
<br />By
<br />Title