<br />8. Project Cost:
<br />
<br />I ~7MULTI- : I
<br />PHASE 1 ENGINEER'S ESTIMATE
<br />HORACE SCHOOL TO 68TH AVE S ( 1.5 MILES)
<br /> --s?EC I-'I-'KUX. UNI
<br />-ITEM l'ID L II UUAI'IIII Y em TC ITAL
<br />1 103 UNIt'<. JNU 1 $2, 0.0 $2,500,00
<br />2 201 _EARl ;RUBBING 7,950 0.75 $5,962,50
<br />3 203 X AVATluN Yl-'~ A 2,250 5.00 $11,250,00
<br />4 203 JI-'~U 3' .UU 3,00000
<br /> 203 3 ,0 1,875,00
<br /> 216 'AI~H M 10,uO $750.00
<br /> 203 ~ TYPE B .00 $3,975,00
<br />8 302 3,3001 1 .OC $49,500.00
<br /> 408 t:lll :M~NI 3,0001 3 ,00 $11 ,000.00
<br />1 408 58-28 1801 ,00 $10 ,000.00
<br />11 702 11 $5,0 0,00 ,000.00
<br /> 704 MHH 1501 $ 8.0( ,IUU.UU
<br />13 704 ~t" UNI 5251 ;3.00 ,575.00
<br />14 704 'E t:A 15 ~50,OO ,250.00
<br /> 4 toA 75 5.00 375,00
<br />16 08 6 Lt- 225 0.00 $1,125,00
<br />17 08 I Al (I:::; $2, 0,00 $11,250,00
<br />18 08~W- 3.00 $112.50
<br />19 714 , ;';l KK. I~~ 0.064 IN 1~.11 9 12.00 1,15200
<br />20 7 ., JKK. ~ I t:t:L 0.06 121N I>. :blUU.UU ,200,00
<br />21 7: ;Ht:~1 - tYP 1051 :blO.UU ,57500
<br />22 7: GAL ~U:; r:; - IUt>t: 3381 :blL.UU ,050.00
<br />23 9 7,950 $1.00 ,950.00
<br />24 90 1 $1,000.00 1,00000
<br />
<br />TOTAL
<br />
<br />
<br />9. Enhancement Activity Category:
<br />
<br />Category 1: Bicycle & Pedestrian Project
<br />a) the construction of bicycle and pedestrian facilities
<br />
<br />10. Project Relation to Surface Transportation:
<br />
<br />Function: The project creates a separated path for casual bicyclists and
<br />pedestrians along a developing busy corridor.
<br />
<br />Proximity: The path will be built on the outside of the backslope of the highway
<br />ditch at the very outside extent of highway right of way to ensure the facility will
<br />remain useful at which time the roadway is improved to an urban section.
<br />
<br />Impact: The impacts of the path are seen to be positive as it will create a
<br />separated facility for those who currently use the shoulder for casual uses. It may
<br />also encourage more recreation in a residential area that does not have local
<br />access to trails or paths.
<br />
<br />11. Supporting Data
<br />
<br />1, Is this project part of an identified tourism, recreation or transportation plan and
<br />if so explain?
<br />
<br />3
<br />
|