Laserfiche WebLink
<br />2009 Construction Projects in Original 2009 Budget <br /> <br />Concrete overlay of Highway 11 from 194 to Highway 22. 6 mile <br />project with an estimated cost of $2,000,000 to be funded with <br />$800,000 County Funds and $1,200,000 in Federal funds. <br /> <br />Asphalt Surfacing of ~ mile of Highway 26 near Perley Bridge. <br />The approach section to the bridge was widened by an earlier <br />project but has not yet been paved. $250,000. <br /> <br />Mill and Asphalt overlay a 3 mile stretch of Highway 10 between <br />Wheatland and Highway 5. $350,000 <br /> <br />Asphalt overlay a 2 mile stretch of Highway 31 from Highway 20 <br />to Highland Park. $400,000 <br /> <br />Chip Seal the follow roads under one contract $750,000. <br />Highway 26 from 129 to State 18 ( 12 miles) <br />Highway 10 from Buffalo to Tower City (7 miles) <br />Highway 1 from Tower City north to gravel (4 miles) <br />