2. Road Dept-budget adjustment
Laserfiche
>
Public
>
County Commission
>
2008
>
10-06-2008
>
Regular agenda
>
2. Road Dept-budget adjustment
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/30/2008 11:45:36 AM
Creation date
9/30/2008 11:45:20 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CASSCOUN1Y <br />GOVERNMENT <br /> <br />..I.. <br /> <br />Highway <br />Department <br /> <br />Keith D. Berndt, P.E. <br />County Engineer <br /> <br />Richard S. Sieg <br />Superintendent <br /> <br />Thomas B. Soucy, P.E. <br />Design and Construction <br />Supervisor <br /> <br />1201 Main Avenue West <br />West Fargo, North Dakota <br />58078-1301 <br /> <br />701-298-2370 <br />Fax 701-298-2395 <br /> <br />RECEIVED <br />SEP 26 2118 <br /> <br />MEMORANDUM <br /> <br />CASSCOUNTYCOMW~ <br /> <br />TO: <br /> <br />Cass County Commission <br /> <br />Keith Berndt, Cass County Engineer ~ <br />September 26, 2008 <br /> <br />FROM: <br /> <br />DATE: <br /> <br />SUBJECT: Road and Bridge 2008 Budget Adjustment <br /> <br />On June 2, 2008 the Commission authorized award of a number of <br />construction projects. The Board also authorized the temporary transfer of <br />funds from the County Building Fund to the Road and Bridge Fund to cover <br />the cost increase. A formal budget adjustment was not made at that time. <br />I recommend that the formal budget adjustment be made now to cover the <br />budget increase. The construction projects are far enough along that there <br />should not be unexpected costs for the remainder of the year. <br /> <br />The current projected expenditures are higher than were projected in June <br />due mainly to quantity increases on the Cass 17 project. We will have to <br />reduce the 2009 construction and maintenance program more than was <br />anticipated to repay borrowed funds. I have identified recommended 2009 <br />reductions to accomplish this. I've enclosed a more detailed discussion of <br />the highway 17 project costs. I've also included a spreadsheet with the <br />most current Road and Bridge Fund projections and suggested 2009 cuts to <br />allow borrowed funds to be repaid. The budget increase suggested below <br />reflects the line items with large increases. The actual expenditures will be <br />lower than the new total because expenditures in some line items will be <br />less than was included in the budget. <br /> <br />I'll be available to answer any questions the Commission has on this matter. <br /> <br />SUGGESTED MOTION: Authorize a budget adjustment to the 2008 <br />Road and Bridge Fund line items and total as listed below. Authorize the <br />use of Road and Bridge Fund reserves and the transfer of the minimum <br />necessary funds from the Building Fund to fund the net increase. <br />
The URL can be used to link to this page
Your browser does not support the video tag.