2a. Road-contract for bridge repairs
Laserfiche
>
Public
>
County Commission
>
2008
>
09-15-2008
>
Regular agenda
>
2a. Road-contract for bridge repairs
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/15/2008 3:22:33 PM
Creation date
9/9/2008 1:40:30 PM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Sep,12, 2008 8:04AM <br /> <br />Cass County Highway Dept. <br /> <br />No.2092 P,7/9 <br /> <br />'1~ ~1IdUu" 1Me. <br /> <br />. <br /> <br />September 9\11 2008 <br /> <br />(;......1 CIf"..'.,. <br /> <br />'HONr 7011l!U-tI71 FAX JOtI2t1.1. <br />p.o. BOX 406 FARGO. NORTH DAKOTA 68107.0408 <br /> <br />w.a DIEDERICH. CtWIIUNf OF THE 8CWlC) <br />PMJL W. DleDEfUCH, PfE8IIENT <br /> <br />Frank Podoll <br />Cus County Highway Department <br />J201 Main Avenue West <br />West Fargo, NO 58078 <br /> <br />Re; Bridge R~irs - Sites 3 -5 (Revised 91912008) <br /> <br />Dear Mr. Podoll, <br /> <br />Ind1tri81 Builders~ Inc. is ploll8ed to quote the following ror the bridse repairs: <br />Site 3 (S Addis0n/32 Durbin) <br />o A. Mobilize to the site, drive 2ea IOx42 - 50' piles for we.'tt pier and remove the 2ea <br />existing timber piling. mobilize to the other side of bridge and drive 1 ea t Ox42 - 50' pile to <br />the east pier and remove the existing timber pile. S22~OO.OO IS <br />o B. Remove approximately 9 bad spots in the timber bridge deck and replace with treated <br />timber planks. Also make a sinrlJar repair to the deck abo'Ve the west abuttnent. $6,000.00 LS <br /> <br />*Note: uA." may stand alone or with "B,", but "R." will not stand alone at the above quoted price. Also. if <br />optiOIJ, I'B." is elected, the work is quoted to take place simultaneously with option "A.'. <br /> <br />/ & Site 4 (J 8/19 Durbin) - Mobilize to site, drive Seal Ox.4~ piles (3-50',2-20'), excavate soil back <br />from SW wing wall, remove existing wing wall and build new using 3"xJ 271 treated timbers, backfill <br />excavation and add additional gravel fill to excavation and to the roadway if necessary. $J 9,880.00 <br />L8 <br />e Site 5 (5/6 Durbin)- Mobilize to site, drive 2ea 101.42 piles (1-50', 1~20')jn S abutment and SE <br />wing wall respectively. excavate soil out n"Om behind S abutment and SE wing wall, pump/divert <br />water away 'from excavation area, add 3ea 3"xl2" plank wlder the existing abut/wing wall, repair <br />bulging SE wing wal~ cover back of plank with geotextile fabric, backffil and add additional gravel <br />fill to excavation. $21,100.00 LS <br /> <br />Conditions; <br />· lBl Furnished IOx42 H Pile: 7ea - 50. & 2ea - 40' '" S 16,291.20 <br />· Traffic control by others. <br />· Reseed all site disturbances 8S necessary. <br />· Bond not included. <br /> <br />Please let me know if you have any furtherqueslions. <br /> <br />Sincerely, <br /> <br />7;'~'~ <br /> <br />Seth E. JOh~ <br />Project Manager <br /> <br />oc: project file <br /> <br />W1It... M !...~ I!tIIpIOylI< tI/IWlH <br />
The URL can be used to link to this page
Your browser does not support the video tag.