Laserfiche WebLink
<br />FOR USE BY WATER RESOURCE DISTRICT AND STATE ENGINEER <br /> <br />ClI The Water Resource District Board has Investigated according to NDAC Section 89-02-01-09.2. <br />ClI The proposed drainage ( !XI will 0 will not) flood or adversely affect lands of downstream landowners. <br /> <br />This application Is hereby: <br /> <br />o Denied <br /> <br />Slgnaturd44~~~ · <br /> <br />Chairman or. Secretor'( of Wate esource District Board <br /> <br />lXI Approved <br /> <br />Date: <br /> <br />July 14, 2008 <br /> <br />(1) The State Engineer or Water Resource District Board may revoke or modify the project and the rights granted <br />under the permit to protect the public health, safety, and welfare; to protect property; or to ensure the orderly <br />control of water resources. <br />(2) Construction must be completed within two years from the date of final approval. <br />(3) See the additional conditions in the attached Notice of Decision. <br /> <br />This application: <br /> <br />o does Involve drainage of state-wide or Interdlstrlct significance <br /> <br />~ does not Involve drainage of state-wide or Interdlstrlct significance ~ ". lB' 0 f> <br /> <br />If the State Engineer has determined that this application does not Involve drainage of state-wide or Interdistrlct <br />significance, approval by the Water Resource District Board constitutes a permit to drain. <br /> <br />If the State Engineer has determined that this application Involves drainage of state-wide or Interdistrict signifi- <br />cance, approval by both the Water Resource District Board and the State Engineer must be given to constitute <br />a permit to drain. <br /> <br />This application Involving drainage of state-wide or Interdlstrlct significance is: <br /> <br />o Denied <br /> <br />Signature: <br /> <br />State EnQlneer <br /> <br />o Approved Date: <br /> <br />CONDITIONS: <br />(1) The State Engineer may revoke or modify the project and the rights granted under the permit to protect the <br />public health, safety, and welfare; to protect property; or to ensure the orderly control of water resources. <br />(2) All highly erodible drainage channels must be seeded to a sod-forming grass, rip-rapped, or utilize control <br />structures as a means of reducing water velocity. <br />(3) The vegetative cover, rlprap, and/or control structure(s) must be adequately maintained for the life of the <br />project. <br />(4) Construction must be completed within two years from the date of final approval. <br /> <br />MaUto: <br /> <br />Office of the State Engineer <br />900 East Boulevard Avenue, Dept 770 <br />Bismarck. ND 58505-0850 <br />