Laserfiche WebLink
<br /> Artists Collective Co-op and Gallery <br /> March 25th. 2008 <br /> Proiect Summary <br /> Construction Bid Cost; $453,000,00 <br /> Studio Space 3,300 <br /> Apartment Construction SF: 6,600 <br /> Construction Bid Cost per SF: $68.64 <br />Division # Division Name Division Cost Division % Cost per SF <br />01 General Requirements $25,000.00 5.52% $3.79 <br /> General $15.000.00 3.31% $2,27 <br /> Permit $5,000,00 1.10% $0,76 <br /> Contingency $5.000,00 1.10% $0,76 <br /> Insurance $0,00 0.00% $0,00 <br />02 Sitework & Demolition $20,000.00 4.42% $3.03 <br /> Demolition $10,000.00 2.21% $1,52 <br /> Excavation and Site Work $5,000.00 1.10% $0,76 <br /> Asbestos removal $5,000,00 1.10% $0.76 <br />03 Concrete $0.00 0.00% $0.00 <br /> Concrete Work $0,00 0.00% $0.00 <br /> Rebar $0,00 0.00% $0,00 <br /> Gypsum Underlayment $0.00 0.00% $0.00 <br />04 Masonry $5,000.00 1.10% $0.76 <br /> Masonry Restoration $5,000,00 1.10% $0.76 <br /> Masonry $0.00 0.00% $0,00 <br />05 Metals $0.00 0.00% $0.00 <br /> Metal Fabrication $0.00 0,00% $0.00 <br />06 Wood & Plastics $66,000.00 14.57% $10.00 <br /> Carpentry $43,000.00 9,49% $6.52 <br /> Finish Carpentry $23,000.00 5.08% $3.48 <br />07 Thermal &Moisture Protection $2,000.00 0.44% $0.30 <br /> Waterproofing $500,00 0.11% $O.OB <br /> Blown Insulation $0,00 0.00% $0,00 <br /> Roofing & Sheet Metal $1,000.00 0.22% $0,15 <br /> Roof Accessories $500,00 0.11% $O.OB <br /> Joint sealant $0.00 0.00% $0.00 <br />08 Doors, Windows, & Glass $55,000.00 12.14% $6.33 <br /> Frames, Doors, & Hardware. $10,000.00 2.21% $1.52 <br /> Wood Windowsl Metal Clad $45,000.00 9.93% $6.82 <br />09 Finishes $35,000.00 7.73% $B.30 <br /> Finishes $35,000.00 7.73% $5.30 <br />10 Specialties $50,000,00 11.04% $7.58 <br /> Residential Appliances $17,000.00 3.75% $2.58 <br /> Residential Casework $25,000.00 5.52% $3,79 <br /> Laminate and Solid Surface Tops $8,000.00 1.77% $1.21 <br />11 Equipment 0.00% <br />12 Furnishings 0.00% <br />13 Special Construction $10,000.00 2.21% $1.52 <br /> Fit-Up for studio space $10,000.00 2_21% $1,52 <br /> $0.00 0.00% $0.00 <br />14 Conveying $0.00 0.00% $0.00 <br /> Elevator $0,00 0.00% $0.00 <br />15 Mechanical 120,000.00 26.49% $18.18 <br /> Plumbing & HVAC 115,000.00 25.39% $17.42 <br /> Sprinkler 0,00 0.00% $0.00 <br /> Utilities 5,000,00 1.10% $0,76 <br />16 Electrical $65,000.00 14.35% $9.85 <br /> Electrical 65.000.00 14.35% $9.85 <br />Construction Estimates for 6600sf apartment plus studio space: $453,000.00 100.00% $68.64 <br />