Laserfiche WebLink
<br />Harwood Pedestrian and Bicycle Crossing Study - 2007 <br /> <br />Feasibility for Construction: <br />The study recommends a detailed analysis of this alternative. <br />Cost Evaluation: <br /> <br />The total cost for this alternative will range from $1,200,000 to $1,500,000 (plus design <br />and administration). For details refer to Section A.2. <br /> <br />Environmental Justice: <br /> <br />The study recommends a detailed analysis of this alternative. <br />Conclusion: <br /> <br />Alternative 5 addresses the needs 2.21, 2.22 and 2.23, but does not meet the cost <br />effective and the short term project criteria. <br /> <br />The study recommends that the City of Harwood work with Metro COG, Cass County <br />and the NDDOT to program a feasibility study looking more specifically at Alternative 5.1 <br /> <br />I <br /> <br />Fargo - Moorhead Metropolitan Council of Governments <br /> <br />- 18 - <br />