4. Road Dept-culvert erosion in Raymond Twp
Laserfiche
>
Public
>
County Commission
>
2007
>
11-05-2007
>
Regular agenda
>
4. Road Dept-culvert erosion in Raymond Twp
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/31/2007 9:24:57 AM
Creation date
10/31/2007 9:20:43 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Options <br /> <br />Replace the bridge with a new one at a cost of $700,000 <br /> <br />1. <br /> <br />Make temporary repairs to keep the bridge in service at an estimated <br />cost of $70,000. (estimated life of repairs somewhat unpredictable, but <br />roughly estimated to be 5 - 20 years). <br /> <br />2. <br /> <br />minate bridge. <br />Ultimately will have to be done. <br />If kept in place, could be used as a footbridge. <br />using it as a footbridge: <br />· Initial cost - ($1,000 to $5,000 depending on how elaborate) <br />· Lose potential hydraulic benefits of removing <br />· Wi II fai I eventually <br />· Automobiles parked <br /> <br />Disadvantages of <br /> <br />residences <br /> <br />more from <br /> <br />e or <br /> <br />il <br /> <br />m <br /> <br />1 <br />4 <br /> <br />Ii <br /> <br />E <br /> <br /> <br />. <br /> <br />. <br /> <br />3. <br />
The URL can be used to link to this page
Your browser does not support the video tag.