Amended items
Laserfiche
>
Public
>
County Commission
>
2007
>
09-17-2007
>
Amended items
>
Amended items
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/17/2007 8:46:34 AM
Creation date
9/17/2007 8:45:30 AM
Metadata
Fields
Template:
Commission
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />CONTRACT APPROVAL REQUEST <br /> <br />INDIVIDUAL REQUESTING CONTRACT: Swingen Construction, Grand Forks, <br />ND <br /> <br />DATE OF EXPECTED RETURN <br />TO THE COMMISSION OFFICE: <br />DATE OF REQUEST: September 13,2007 September 17. 2007 <br /> <br />DEPARTMENT HEAD REQUESTING SIGNATURE:Keith Berndt 298-2372~ <br />STATES ATTORNEY SIGNATURE: <br />STATES ATTORNEY COMMENTS: <br /> <br />PORTFOLIO COMMISSIONER SIGNATURE: <br />NOTE: This is a proposed contract with Swingen Construction for Bridge Repairs to a <br />recently closed bridge in Everest Township. Bids were opened today. Bid results are <br />attached. The Contract includes County provided Steel and Timber with the contractor <br />completing the repairs. <br /> <br />States Attorney Note - Please specifically review contract award over $30,000 as <br />it relates to NDCC 24-08-03. <br /> <br />SUGGESTED MOTION: AUTHORIZE CHAIRMAN TO SIGN <br />CONTRACT WITH SWINGEN CONSTRUCTION COMPANY TO REPAIR <br />BRIDGE BETWEEN SECTIONS 28 AND 29 OF EVEREST TOWNSHIP IN <br />THE AMOUNT OF $43,400. <br /> <br />J:\Admin-Eng\Commission Corrsp\2007 Commission Correpondence\Contract Approval Swingen Everest Bridge repair. doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.