2024-05-02
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2024
>
2024-05-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2024 3:30:07 PM
Creation date
6/7/2024 3:30:06 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
7 <br /> <br />locations under the following Maple River Water Resource District facilities, rivers, and <br />natural watercourses in the following townships, with special conditions provided by the <br />Water Resource District Engineer: <br />• Coburn Township Drain #2 <br />• Drain #15 <br />• Drain #37 <br />• Drain #54 <br />• Drain #58 <br />• Buffalo Creek <br />• Durbin-Everest Channel <br />• Wheatland Channel <br />• Buffalo Creek tributary <br />• Maple River <br />• Maple River tributary <br />• Addison Township <br />• Davenport Township <br />• Durbin Township <br />• Everest Township <br />• Gill Township <br />• Leonard Township <br />• Maple River Township <br />• Walburg Township <br />Upon roll call vote, the motion carried unanimously. <br /> <br />Correspondence from the NDDWR regarding low head dam cost-share funding and <br />safety signage <br />Discussion was held on correspondence from the NDDWR regarding cost-share funding <br />for safety projects and safety signage availability for low head dams in North Dakota. The <br />Board directed the Water Resource District Engineer to look into the locations and bring <br />back information regarding low head dams in Maple River Water Resource District. <br /> <br />Bills <br />It was moved by Manager Melvin and seconded by Manager Miller to approve the <br />payment of Checks #6176 and #6177, the wire transfers, and electronic funds transfers, <br />as presented. Upon roll call vote, the motion carried unanimously. <br /> <br />Treasurer <br />The Secretary recommended the Board consider transferring the title of Treasurer of the <br />Maple River Water Resource District to the Accountant, Leilei Bao, as Ms. Bao has <br />completed training and is excelling in her role. <br /> <br />It was moved by Manager Miller, seconded by Manager Melvin, and unanimously carried <br />to appoint Leilei Bao as Treasurer of Maple River Water Resource District. <br /> <br />Drain #14 – request from Suzanne Brehm to clean out and repair an intercept <br />culvert in Section 25 of Addison Township <br />Mr. Woodard reported the intercept culvert in Section 24 of Addison Township regarding <br />Drain #14 has been repaired and cleaned out. <br /> <br />Pontiac Township Improvement District No. 73 – clean out of culverts <br />Manager Woodard reported the culverts throughout the Pontiac Township Improvement <br />District No. 73 project need to be cleaned out. It was moved by Manager Melvin and <br />seconded by Manager Miller to authorize Moore Engineering, Inc. to hire a contractor to <br />clean out the culverts throughout the Pontiac Township Improvement District No. 73 <br />project. Upon roll call vote, the motion carried unanimously.
The URL can be used to link to this page
Your browser does not support the video tag.