Laserfiche WebLink
Updated 3/2019 <br />CONTRACT APPROVAL REQUEST <br /> <br />COMPANY REQUESTING CONTRACT: <br />Houston Engineering, Inc., 1401 21st Ave N, Fargo, ND 58102 <br />DATE OF REQUEST: February 21, 2024 <br />DATE OF EXPECTED RETURN TO THE COMMISSION OFFICE: March 4, 2024 <br />DEPARTMENT HEAD REQUESTING SIGNATURE: Thomas Soucy, 701-298-2374 <br />STATE’S ATTORNEY SIGNATURE: <br />STATE’S ATTORNEY COMMENTS: <br /> <br /> <br />PORTFOLIO COMMISSIONER SIGNATURE: <br /> <br />Attached are the contract documents for Houston Engineering, Inc. for Hydraulic Studies for <br />the design of future bridges. These bridges are part of the 5 year highway and bridge plan. The <br />hydraulic studies are needed to size the bridges. The estimated cost of this work is $12,500.00 <br /> <br />TB2510 1 Kinyon/6 Noble Twp. – Drain 16 <br />TB2304 25 Kinyon/30 Noble Twp. – Drain 19 <br /> <br />SUGGESTED MOTION: AUTHORIZE CHAIRPERSON TO SIGN CONTRACT DOCUMENTS WITH <br />HOUSTON ENGINEERING, INC. FOR THE HYDRAULIC STUDIES SUBJECT TO STATE’S ATTORNEYS <br />APPROVAL. <br /> <br /> <br /> <br />J:\Admin-Eng\Commission Corrsp\2024 Commission Correspondence\Hydraulic Studies - Houston\Contract Approval Request Houston 2024 Hydraulic Studies 022124.docx