2023-11-28
Laserfiche
>
Public
>
Water Resource Districts
>
North Cass
>
Minutes
>
2023
>
2023-11-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2024 5:12:06 PM
Creation date
1/4/2024 5:12:05 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2 <br /> <br />Drain No. 26 Improvements 2023 <br />Mr. Lysne reported Moore Engineering, Inc. is working on the hydraulic modeling and <br />design of the Drain No. 26 Improvements 2023 project. <br /> <br />Drain #32 – berm washout in Section 32 of Noble Township <br />Mr. Woodard stated the Drain #32 berm washout in Section 32 of Noble Township has <br />been repaired. An erosion control blanket was installed to help prevent future washouts <br />of the berm. <br /> <br />Drain #55 – berm repair in the southeast corner of Section 21 in Bell Township <br />Mr. Woodard said the Drain #55 berm in the southeast corner of Section 21 in Bell <br />Township was repaired. An erosion control blanket was also installed in this area. <br /> <br />Application to Install a Subsurface Water Management System No. 202327 for Kyle <br />Oetker in the NE 1/4 of Section 34 in Wiser Township <br />The Board next reviewed Application to Install a Subsurface Water Management System <br />No. 202327, filed November 1, 2023, by Applicant Kyle Oetker. Under the Application, <br />Applicant seeks to install a 155-acre drain tile system in the NE 1/4 of Section 34 in <br />Wiser Township, Cass County, North Dakota. The project will include a single pump <br />outlet located along the north boundary of the NE 1/4 in Section 34; the pump will <br />discharge into the south road ditch along 23rd Street SE; the discharge will flow east in <br />the south road ditch along 23rd Street SE, along the north boundary of the NE 1/4 in <br />Section 34, under 172nd Avenue SE, and along the north boundary of Section 35. <br /> <br />According to County tax roll information, Kyle and Danielle Oetker own the NE 1/4 of <br />Section 34 in Wiser Township where Applicant intends to install the tile system. With <br />regard to downstream properties, Wayne Diekrager owns the NW 1/4 of Section 35, and <br />Heiden Family LLLP owns the NE 1/4 of Section 35. <br /> <br />Manager Thompson moved, and Manager Lougheed seconded the motion, to approve <br />Application to Install a Subsurface Water Management System No. 202327, filed <br />November 1, 2023, for Kyle Oetker regarding a proposed tile system in the NE 1/4 of <br />Section 34 in Wiser Township; and to authorize the Secretary-Treasurer to sign <br />Subsurface Water Management Permit No. 202327, subject to the following conditions: <br /> <br />1. Applicant will install and maintain erosion protection at any and all outlets <br />into Wiser Township’s right of way. <br /> <br />2. Applicant will turn off any pump outlets and otherwise close all outlets during <br />“critical flood periods,” as determined by the North Cass Water Resource <br />District. <br /> <br />3. Applicant will re-establish any areas disturbed installing or maintaining <br />Applicant’s tile system. <br /> <br />4. Applicant will remove silt or vegetation, or repair erosion or scour damages <br />directly caused by Applicant’s tile system, but only up to one mile <br />downstream from the project outlet.
The URL can be used to link to this page
Your browser does not support the video tag.