01. Space needs discussion
Laserfiche
>
Public
>
County Commission
>
2024
>
01-02-2024
>
Regular Agenda
>
01. Space needs discussion
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/27/2023 9:43:51 AM
Creation date
12/27/2023 9:43:50 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
ii. Larger ducts and piping are more difficult to modify and would restrict heights <br />along the west and south sides of the courtroom. <br />B. Mechanical room/Secure hallway <br />a. Secure hallway restricts access to mechanical space. <br />i. Free egress (unsecured) from mechanical room must be considered <br />ii. Ducts and pumps along the south wall impedes adding egress without major <br />reconfiguration and would impact existing conference room. <br />iii. Masonry walls around mechanical room need to be reconfigured which will be <br />more challenging as these are currently constructed to the floor deck above <br />(approx. 15’ tall) and new ones would need to work around existing infrastructure. <br /> <br /> <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br />Steve Skoblik, AIA <br />Principal/Project Manager <br />Foss Architecture & Interiors <br /> <br /> <br />cc: File <br />
The URL can be used to link to this page
Your browser does not support the video tag.