e. Adopt 2024 to 2028 Cass County Comprehensive Highway and Bridge Plan
Laserfiche
>
Public
>
County Commission
>
2023
>
12-18-2023
>
Consent Agenda
>
e. Adopt 2024 to 2028 Cass County Comprehensive Highway and Bridge Plan
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/11/2023 4:02:55 PM
Creation date
12/11/2023 4:02:13 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
" <br />" <br />"" <br />" <br />Casselton <br />Enderlin <br />Tower <br />City Buffalo <br />Leonard <br />Alice <br />!"a$!"a$ <br />§§ <br />| <br />g <br />g <br />g <br />EfGH <br />EdGH <br />EeGHEeGH <br />E`GH <br />E`GH <br />EeGH <br />EbGH <br />EªGH <br />EªGH <br />EªGH <br />EiGH EiGH <br />EdGH EwGH <br />EfGH <br />EkGH <br />EpGH EpGH <br />EfGH <br />EpGH <br />EpGH <br />EpGH <br />EdGH <br />EhGH <br />EiGH <br />E¢GH <br />31 32 33 34 35 36 31 32 33 31 32 33 34 35 36 31 35 36 <br />30 29 28 27 26 25 30 29 28 30 29 28 27 26 25 30 26 25 <br />19 20 21 22 23 24 19 20 21 22 23 24 19 20 21 22 23 24 19 20 21 22 23 24 <br />18 17 16 15 14 13 18 17 16 15 14 13 18 16 15 14 13 18 17 16 15 <br />07 08 09 10 11 12 07 08 09 10 11 11 12 07 08 09 10 <br />06 05 04 03 02 01 06 05 04 03 02 01 06 05 04 03 <br />31 32 33 34 35 36 31 32 33 34 32 34 35 36 31 32 33 34 35 <br />30 29 28 27 26 25 30 29 28 27 26 25 30 28 27 26 25 30 29 26 25 <br />19 20 21 23 24 19 20 21 22 23 21 22 23 24 19 20 21 <br />18 14 17 16 15 14 16 15 14 13 18 17 16 15 <br />07 10 11 12 07 08 09 10 11 08 09 10 11 12 07 08 09 10 <br />06 02 01 06 05 04 03 02 01 06 05 04 03 02 01 06 05 <br />31 35 36 31 32 33 34 35 36 31 32 33 34 35 36 31 32 <br />30 26 25 30 29 28 27 26 25 30 29 28 27 26 25 28 <br />19 20 21 22 23 24 19 20 21 22 23 20 21 22 23 24 21 22 23 24 <br />18 17 16 15 14 13 18 17 16 15 14 17 16 15 15 14 <br />07 08 09 10 11 12 07 08 09 10 11 12 07 08 09 10 <br />04 03 02 01 06 05 04 03 02 01 06 05 04 03 02 01 <br />33 34 35 36 31 32 33 34 35 36 31 32 33 34 35 36 31 32 <br />27 26 25 30 29 28 27 26 25 30 29 28 27 26 25 <br />19 22 23 24 21 22 23 24 19 20 21 22 23 24 23 24 <br />18 17 16 15 14 13 16 15 14 13 18 17 16 15 14 13 14 13 <br />13 <br />24 <br />1813 <br />25 <br />27 <br />17 <br />12 07 <br />17 <br />24 19 <br />13 18 <br />05 04 03 <br />32 33 34 <br />29 28 27 <br />13 <br />12 <br />01 <br />36 <br />28 27 <br />22 <br />30 <br />18 17 <br />19 22 <br />05 <br />08 09 <br />11 12 <br />23 24 <br />14 13 <br />10 <br />0304 <br />33 <br />29 <br />20 21 <br />04 <br />33 <br />03 <br />34 <br />28 <br />2120 <br />27 <br />343233 <br />29 28 <br />31 <br />06 <br />0712 <br />35 <br />02 01 <br />36 <br />14 13 <br />02 <br />11 12 <br />29 <br />20 <br />29 <br />05 <br />32 <br />30 <br />06 <br />31 <br />19 20 <br />18 17 <br />33 <br />262827 <br />16 15 <br />14 13 <br />11 12 10 11 <br />18 <br />19 <br />36 <br />07 <br />06 <br />01 <br />16 <br />08 09 <br />05 04 <br />34 <br />27 <br />35 36 <br />26 25 <br />26 <br />02 <br />35 36 <br />25 <br />01 <br />30 29 <br />18 17 <br />19 20 <br />34 <br />03 02 <br />35 <br />22 <br />1516 <br />0908 <br />17 <br />XX <br />XX <br />X <br />X <br />X <br />X <br />X <br />XX <br />X <br />X <br />X <br />X <br />X <br />X <br />X X <br />X X <br />X <br />X <br />X X <br />X <br />X <br />X <br />X <br />X <br />X <br />X <br />P O N T I A C <br />T W P <br />P O N T I A C <br />T W P <br />H I G H L A N D <br />T W P <br />H I G H L A N D <br />T W P <br />W A T S O N <br />T W P <br />W A T S O N <br />T W P <br />L E O N A R D <br />T W P <br />L E O N A R D <br />T W P <br />C L I F T O N <br />T W P <br />C L I F T O N <br />T W P <br />E L D R E D <br />T W P <br />E L D R E D <br />T W P <br />W A L B U R G <br />T W P <br />W A L B U R G <br />T W P <br />M A P L E R I V E R T W PM A P L E R I V E R T W P <br />H I L L <br />T W P <br />H I L L <br />T W P <br />H O W E S <br />T W P <br />H O W E S <br />T W P <br />G I L L <br />T W P <br />G I L L <br />T W P <br />E V E R E S T <br />T W P <br />E V E R E S T <br />T W P <br />T O W E R <br />T W P <br />T O W E R <br />T W P <br />B U F F A L O <br />T W P <br />B U F F A L O <br />T W P <br />W H E A T L A N D <br />T W P <br />W H E A T L A N D <br />T W P <br />C A S S E L T O N <br />T W P <br />C A S S E L T O N <br />T W P <br />Wheatland <br />Woods <br />Embden <br />LynchburgChaffee <br />Buffalo <br />C <br />r <br />e <br />e <br />k <br />Maple <br />River <br />SwanCreek <br />M <br />apleRiver <br />M aple Ri ver <br />Drain 73 <br />Drain 2Drain <br />64Swan Creek Diversion <br />Drain 59Drain 54 <br />Drain62 <br />Drain 15Drain 5 8 <br />cost per highway in this quadrant <br />under $100K <br />$100K - $250K <br />$250K - $5000K <br />$500K - $1M <br />$1M - $5M <br />$5M - $10M <br />over $10M <br /> (4) <br /> (0) <br /> (0) <br /> (0) <br /> (0) <br /> (8) <br /> (4) <br /> (1) <br /> (0) <br /> (0) <br />cost per structure in this quadrant <br /> (3) <br /> (11) <br /> (7) <br /> (2) <br /> (2) <br />PavedGravel <br />Projects also occurred on structures currently in Fargo (1) and West Fargo (2) that are displayed in the mapbut are not included in the counts above. Since being constructed by Cass County, these 3 structures havebeen turned over to those cities. <br />under $100K <br />$100K - $250K <br />$250K - $500K <br />$500K - $1M <br />over $1M <br />RemovedMajorMinor <br />map updated October 2023 <br />1201 Main Ave. WWest Fargo, ND 58078 <br />(701) 298-2370 <br />www.casscountynd.gov <br />highway@casscountynd.gov <br />Jason BensonCounty Engineer, P.E. <br />Tom SoucyDeputy County Engineer, P.E. <br />Blaine LaavegHighway Superintendent <br />C a s s C o u n t y H i ghway D e p a r t m e n t <br />southwest quadrant <br />2000 - 2022 <br />Construction Project History <br />Appendix 20c <br />Note: <br />Projects for school beacons and snow gates on County Highways are not displayed in the map but are included in highway costs. <br />Bridge Removals 4 $221,892 <br />Bridge Repairs 6 $438,211 <br />New Bridges 36 $9,912,591 <br />Total Bridge Cost $10,572,694 <br />Total Road Cost $30,821,379 <br />Final Cost $41,394,073 <br />RoadProjectType Count Cost**
The URL can be used to link to this page
Your browser does not support the video tag.