26 <br /> <br />2029-2033 Highway Improvement Plan <br />With all the different/changing circumstances revolving funding, grants, and supply chain issues we felt it was <br />necessary to have a 5-10 year plan to give us more flexibility to move projects around from year to year <br />depending on funding. This also gives us the ability to plan further into the future with federal funding, grant <br />applications, hydraulic reports, and other necessary permitting needed to construct the project. In turn we will <br />have more shelf ready projects that can easily be bid and constructed with little to no work. This was very <br />apparent to us as we were going through the RAISE grant application. The more accurate the plans/costs are the <br />more accurate our future grant applications will be, which in turn will give us a better chance to secure future <br />those grants. <br />Table 8 illustrates the proposed highway projects from year 5 to year 10 that are a result of these components. <br /> <br />