Laserfiche WebLink
23 <br /> <br />allocate a significant portion to improving the roadway, culverts, and ditches of our gravel roads. Table 5 <br />illustrates the proposed highway projects for the next five years that are a result of these components. <br /> <br />2024-2028 Bridge Improvement Plan <br />The County utilizes bi-annual inspection reports provided by the NDDOT to identify necessary improvements to <br />County and township structures. Funding is allocated annually to account for these necessary improvements. In <br />addition to these improvements the County includes, in the construction schedule, necessary flood repairs <br />which combine local and federal funds. There are approximately 49 bridges currently slated for improvements <br />with additional funding set aside for replacing minor structures. Table 6 illustrates the proposed bridge <br />improvements for 2024-2028.