<br />2 <br /> <br />however, a power pole will need to be relocated in order to widen the intersection for <br />increased safety. Moore Engineering, Inc. will refine the cost estimate for the proposed <br />project, including right of way, and bring the updated information to a future meeting for <br />further discussion. The Board directed Moore Engineering, Inc. to check on contractor <br />availability to complete the project this fall. The project could be completed this fall if a <br />contractor is available and the pipe is available, depending on weather conditions. Moore <br />Engineering, Inc. will also contact Gunkel Township and Gardner Township regarding <br />work needed in their right of way for the proposed project. <br /> <br />Drain No. 26 Improvements 2023 <br />Ms. Ducioame discussed the design and preliminary cost estimate for the Drain No. 26 <br />Improvements 2023 project. Ms. Ducioame noted there is significant sedimentation in <br />the channel. Brief discussion was held on funding for the project. Moore Engineering, <br />Inc. will also evaluate right of way needs for the project and update the cost estimate <br />accordingly. <br /> <br />Drain #32 – berm washout in Section 32 of Noble Township <br />Mr. Woodard stated the Drain #32 berm washout in Section 32 of Noble Township will be <br />repaired after the adjacent crops have been harvested. Manager Lougheed reported the <br />adjacent crops have recently been harvested. <br /> <br />Bills <br />It was moved by Manager Thompson and seconded by Manager Lougheed to approve <br />payment of the wire transfers and the electronic funds transfers, as presented. Upon roll <br />call vote, the following Managers voted in favor: Ecker, Thompson and Lougheed. The <br />motion carried unanimously. <br /> <br />Elm River Dam Nos. 1, 2 and 3 <br />Manager Thompson said he remains in contact with the North Dakota Department of <br />Water Resources regarding the construction permits for Elm River Dams No. 1 and No. <br />2 Improvement Project No. 2022-01 and Elm River Dam No. 3 Improvements 2022 <br />Project. The projects will be bid soon with construction anticipated to occur in 2024. <br /> <br />Drain #32 – request to borrow material from the berm in the SE 1/4 of Section 27 in <br />Noble Township <br />Sean Fredricks reported John Christensen has signed the License and Hold Harmless <br />Agreement and reimbursed the Water Resource District $500 for fees incurred regarding <br />Mr. Christensen’s request to borrow of material from the Drain #32 berm in the SE 1/4 of <br />Section 27 in Noble Township. Mr. Christensen can now proceed with borrowing material <br />from the Drain #32 berm in the SE 1/4 of Section 27 in Noble Township in accordance <br />with the License and Hold Harmless Agreement. <br />