Laserfiche WebLink
<br /> <br />8 <br /> <br />The Board will provide copies of the Board’s Notice of Decision, Subsurface Water <br />Management Permit No. 202325, and Applicants’ downstream flow map to the North <br />Dakota Department of Water Resources, the Cass County Highway Department, the <br />Davenport Township Board of Township Supervisors, Catherine A. Lee, and Cass Rural <br />Water Users District. Applicants’ detailed project design map is an exempt record, and <br />the Board will not provide copies to any third parties. <br /> <br />Utility Permits <br />A motion was made by Manager Melvin and seconded by Manager Miller to approve the <br />following Utility Permits, with input from the Water Resource District Engineer: <br />• For MLGC, L.L.C. to install fiber optic cable under Drain #39 in the NE 1/4 of <br />Section 35 in Maple River Township <br />• For MLGC, L.L.C. to install fiber optic cable under Drain #39 in the NE 1/4 of <br />Section 36 in Maple River Township <br />• For Montana-Dakota Utilities Co. to install 6” steel pipe gas line on and under Drain <br />#62 in the SE 1/4 of Section 32 and the SW 1/4 of Section 34 in Casselton <br />Township <br />• For Cass County Electric Cooperative to install underground power line under <br />Wheatland Channel in the NE 1/4 of Section 8 in Everest Township <br />• For Dakota Carrier Network to install fiber optic cable under the Wheatland <br />Channel in the NE 1/4 of Section 8 in Everest Township <br />Upon roll call vote, the motion carried unanimously. <br /> <br />Bills <br />It was moved by Manager Melvin and seconded by Manager Miller to approve payment <br />of the wire transfers and electronic funds transfers, as presented. Upon roll call vote, the <br />following Managers voted in favor: Olson, Melvin and Miller. The Chairman declared the <br />motion passed. <br /> <br />Notification to Install Subsurface Water Management System <br />The Board received and filed a Notification to Install Subsurface Water Management <br />System from Empire Drainage in the N 1/2 NW 1/4 of Section 13 in Tower Township. <br /> <br />Subsurface Water Management System Permits – critical flood periods <br />The Board discussed ways to communicate with Subsurface Water Management <br />Systems permitees regarding turning off pumps during critical flood periods, as <br />determined by the Water Resource District. <br /> <br />