2023-07-06
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2023
>
2023-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:56:19 PM
Creation date
8/9/2023 2:56:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> <br />16 <br /> <br />coordinating the design and utility installation with MLGC, L.L.C. to ensure it will not <br />impact construction of the Davenport Flood Risk Reduction Project. MLGC, L.L.C. will <br />install the crossings prior to construction of the Davenport Flood Risk Reduction Project. <br /> <br />It was moved by Manager Miller and seconded by Manager Melvin to approve the <br />following, with input from the Water Resource District Engineer: <br />• Utility Permit for Casselton Development, LLC to install a 72” storm sewer outfall <br />pipe into Swan Creek Diversion on parcel #38-0000-04807-140 west of North <br />Dakota Highway 18 <br />• Utility Permit for Cass Rural Water Users District to install a water return line under <br />Swan Creek approximately 60’ west of the centerline of 154th Avenue SE in the <br />southeast corner of Section 28 in Casselton Township <br />• Utility Permit for Cass Rural Water Users District to install a water supply pipeline <br />under Swan Creek approximately 70’ west of the centerline of 154th Avenue SE in <br />the southeast corner of Section 28 in Casselton Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under a natural <br />watercourse upstream of Drain #14 in the SW 1/4 of Section 35 in Addison <br />Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under a natural <br />watercourse upstream of Drain #14 in the SE 1/4 of Section 35 in Addison <br />Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under a natural <br />watercourse upstream of Drain #14 in the NW 1/4 SW 1/4 SW 1/4 of Section 36 in <br />Addison Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under a natural <br />watercourse upstream of Drain #14 in the NW 1/4 NW 1/4 SW 1/4 of Section 36 in <br />Addison Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under a natural <br />watercourse upstream of Drain #14 in the NW 1/4 NW 1/4 of Section 25 in Addison <br />Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under Drain #15 in the <br />SW 1/4 of Section 35 in Maple River Township <br />• Utility Permit for MLGC, L.L.C. to install a fiber optic cable under Drain #39 in the <br />SE 1/4 of Section 36 in Maple River Township <br />Upon roll call vote, the motion carried unanimously. <br /> <br />Cass County Planning <br />A motion was made by Manager Melvin and seconded by Manager Miller to authorize the <br />Secretary-Treasurer to submit comment on the Link Subdivision application to Cass <br />County Planning with input from the Water Resource District Engineer. Upon roll call vote, <br />the motion carried unanimously. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.