Laserfiche WebLink
<br /> <br />11 <br /> <br />will discharge via pipelines that will both run into the SE 1/4 of Section 27; one outlet will <br />daylight and discharge directly into the Maple River and the other will discharge into a <br />natural watercourse in the SE 1/4 of Section 27 that ultimately flows into the Maple River. <br /> <br />According to records submitted by Applicant, Jacob Paul Richman owns the NE 1/4 of <br />Section 28; Matthew and Jennifer Richman own the NW 1/4 of Section 27 and the SE 1/4 <br />of Section 27; and Mark and Pamela Johnson own the SW 1/4 of Section 27. <br /> <br />Manager Melvin moved, and Manager Miller seconded the motion, to approve Application <br />to Install a Subsurface Water Management System No. 202316, filed June 27, 2023, for <br />the M and M Farms Partnership regarding a proposed tile system in the NE 1/4 of Section <br />28, the W 1/2 of Section 27, and the SE 1/4 of Section 27 in Tower Township; and to <br />authorize the Secretary-Treasurer to sign Subsurface Water Management Permit <br />No. 202316, subject to the following conditions: <br /> <br />1. Applicant will install and maintain erosion protection at any and all outlets <br />into the Maple River and the natural watercourse in the SE 1/4 of Section <br />27 in Tower Township. <br /> <br />2. Applicant will re-establish any areas disturbed installing or maintaining <br />Applicant’s tile system. <br /> <br />3. Applicant will not install Applicant’s tile system within 20 feet, on either side, <br />of any rural water lines Cass Rural Water Users District has in the NE 1/4 <br />of Section 28, the W 1/2 of Section 27, or in the SE 1/4 of Section 27 in <br />Tower Township under any blanket easements, or otherwise beyond the <br />Water Users District’s existing easement(s). <br /> <br />4. Applicant must apply for an amendment to Subsurface Water Management <br />Permit No. 202316 in advance of any proposed alterations to outlet <br />locations, the addition of any outlets, or improvements or modifications to <br />the tile system that could increase the capacity or drainage area of the tile <br />system. <br /> <br />Upon roll call vote, the motion carried unanimously. <br /> <br />Under Section 61-32-03.1, the Board cannot attach any additional conditions to <br />Applicant’s permit. However, for Applicant’s protection, and to ensure protection of <br />Applicant’s tile system, the Board will recommend that Applicant comply with the <br />following: <br /> <br />1. The Board recommends that Applicant obtain written consent from the <br />Tower Township Board to install any pipeline or other project components in <br />the Township’s road right of way. <br /> <br />2. The Board recommends that Applicant obtain easements or written consent <br />from the owners of the property where Applicant intends to install any tile <br />components.