2023-07-06
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2023
>
2023-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2023 2:56:19 PM
Creation date
8/9/2023 2:56:18 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br /> MINUTES OF VIRTUAL / CONFERENCE CALL MEETING <br /> MAPLE RIVER WATER RESOURCE DISTRICT <br />ORIGINATING AT THE CASS COUNTY HIGHWAY DEPARTMENT <br />WEST FARGO, NORTH DAKOTA <br />JULY 6, 2023 <br /> <br /> <br />A virtual / conference call meeting of the Maple River Water Resource District was held <br />on July 6, 2023, at 8:00 a.m. <br /> <br />Present were Rodger Olson, Chairman; Gerald Melvin, Manager; Chad Miller, Manager; <br />Carol Harbeke Lewis, Secretary-Treasurer; Nina Stone, Accountant; Melissa <br />Hinkemeyer, Administrative Assistant; Sean M. Fredricks, Ohnstad Twichell, P.C.; Kurt <br />Lysne, Alexa Ducioame, Brady Woodard and Levi Hanson, Moore Engineering, Inc.; Mike <br />Opat, Houston Engineering, Inc.; Duane Breitling, Cass County Commissioner; Tom <br />Soucy, Cass County Highway Department; Kellen Grubb, AE2S; Sidney Steinweg, <br />Davenport Township property owner; and Ryan Ottis, Ottis Contracting LLC. <br /> <br />Agenda <br />It was moved by Manager Melvin, seconded by Manager Miller and unanimously carried <br />to approve the order of the agenda, as presented. <br /> <br />Minutes <br />It was moved by Manager Melvin and seconded by Manager Miller to approve the minutes <br />of the June 1 and 19, 2023, meetings. Upon roll call vote, the motion carried unanimously. <br /> <br />Wheatland Channel – Grand Farm crossings in the NE 1/4 of Section 8 in Everest <br />Township <br />Sean Fredricks updated the Board on the Grand Farm Subdivision plat in the NE 1/4 of <br />Section 8 in Everest Township regarding the Wheatland Channel. The Permanent <br />Easement with Grand Farm was recorded, and the document number included on the <br />plat, which has also been recorded. Mr. Fredricks said the Board can now consider the <br />Release of Easement on the property and finalize the Permanent Access Agreement for <br />the Grand Farm crossings in the NE 1/4 of Section 8 in Everest Township regarding the <br />Wheatland Channel. Grand Farm is currently reviewing the Permanent Access <br />Agreement. <br /> <br />Kurt Lysne reported construction has begun on the Grand Farm crossings in the NE 1/4 <br />of Section 8 in Everest Township regarding the Wheatland Channel. Grand Farm has <br />accommodated the Water Resource District’s future needs regarding the Wheatland <br />Channel in the NE 1/4 of Section 8 in Everest Township. <br /> <br />Drain #14C – Application for Surface Drain for construction of the drop structure <br />on Cass County Highway 15 regarding the Metro Flood Diversion Project <br />Mr. Lysne stated the North Dakota Department of Water Resources (NDDWR) has <br />requested an Application for Surface Drain be submitted for the construction of the Drain
The URL can be used to link to this page
Your browser does not support the video tag.