Laserfiche WebLink
SCHEDULE A <br />Project Total Approved Paid Left to Pay <br />Closed Projects 4,795,616.54$     4,795,616.54$    ‐$  <br />2015 Upper Maple River Detention Study Phase II 45,500.00$           37,068.77$        8,431.23$             <br />2015 Rush River Detention Study Phase II 45,500.00$           34,422.58$        11,077.42$           <br />2017 Sheldon Addition Ring Levee Project 462,750.00$        ‐$ 462,750.00$         <br />2018 City of Hunter Dam Projects 23,582.80$           11,527.09$        12,055.71$           <br />2019 T‐180 Dam Safety Improvements 24,765.89$           ‐$ 24,765.89$           <br />2020 Hofer Property 512,281.80$        496,455.85$      15,825.95$           <br />2020 Davenport Levee 1,425,000.00$     ‐$ 1,425,000.00$     <br />2021 Gill Township Road 14,250.00$           ‐$ 14,250.00$           <br />2021 Maple River Township Road 64,970.00$           ‐$ 64,970.00$           <br />2022 Cass 15 Bridge 50%920,985.00$        ‐$ 920,985.00$         <br />2022 Normanna Township Bank Stabilization 90% 950,438.00$        ‐$ 950,438.00$         <br />2022 Lilleberg Buyout 90%114,273.90$        ‐$ 114,273.90$         <br />2022 Elm River Dam 2/3 95,267.00$           ‐$ 95,267.00$           <br />2022 Fill Township Slide Repair 75%27,063.00$           ‐$ 27,063.00$           <br />2022 Durbin Township Slide Repair 75%41,947.50$           41,941.50$        6.00$ <br />2022 Everest Township Slide Repair 75%21,000.00$           13,689.17$        7,310.83$             <br />2022 Maple River Twonship Slide Repair 75% 45,000.00$            ‐$ 45,000.00$           <br />2022 Mapleton Flap Gate ‐ Storm Sewer Outfalls 75%60,000.00$           ‐$ 60,000.00$           <br />2022 Highway 81 Slide Repair 75%950,287.00$        ‐$ 950,287.00$         <br />2022 Reed Township Sheyenne Riverbank Stabilization 50%8,650.00$             ‐$ 8,650.00$             <br />2022 Elm River Dam Number 3 Improvements 90%16,830.00$           1,913.53$           14,916.47$           <br />2022 Casselton Lagoon Slide Repair 75% 525,000.00$         ‐$ 525,000.00$         <br />2022 Upper Maple river Detention Study Phase II Part 2 90%27,720.00$           ‐$ 27,720.00$           <br />Total 11,218,678.43$   5,432,635.03$   5,786,043.40$     <br />Reserve for County Projects 2023 Activity <br />Balance of Cash Carried forward from 2022 10,308,892.80$    <br />2023 Reserves 139,293.75            <br />Total 10,448,186.55      <br />Paid in 2023 ‐  <br />Encumbrances 5,786,043.40        <br />Un‐encumbered Balance 4,662,143.15$      <br />Current County Projects  <br />2/1/2023