2023-02-02
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2023
>
2023-02-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2023 12:05:45 PM
Creation date
3/10/2023 12:05:45 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />2 <br /> <br />Drain #37 Improvement Project <br />Ms. Ducioame updated the Board on the Drain #37 Improvement Project. The NDDWR <br />economic analysis for the project was lower than anticipated due to changes in the <br />NDDWR economic analysis processes. Moore Engineering, Inc. will meet with the <br />NDDWR economist to further discuss the project’s economic analysis. The request for <br />cost-share was removed from the February 9, 2023, State Water Commission meeting <br />and it is hoped it will be considered at the April meeting. <br /> <br />2022 facility inspections – Drain #39 slide in Section 24 of Maple River Township <br />Ms. Ducioame and Brady Woodard discussed the preliminary plans to repair the slide on <br />Drain #39 in Section 24 of Maple River Township. Scott Saewert indicated Maple River <br />Township is agreeable to the project if the adjacent township road is not disturbed. Mr. <br />Woodard noted the project will improve the safety of the adjacent road as the side slopes <br />of Drain #39 will be laid back. The road and shoulder widths will remain the same. Moore <br />Engineering, Inc. will prepare a visual showing the existing road and the proposed project <br />for Maple River Township to review. Mr. Saewert inquired if crossings are included in the <br />project. Mr. Woodard stated the existing Drain #39 crossings in Section 24 of Maple River <br />Township are in good condition and on grade so they will remain in place. There will be <br />transitions to tie the new project into the existing crossings. <br /> <br />Drain #62 – North Dakota Soybean Processors, LLC <br />Ms. Ducioame stated final plans were received from the North Dakota Soybean <br />Processors, LLC for the Drain #62 relocation project in Section 33 of Casselton Township. <br />An Application for Surface Drain will be needed for the project. <br /> <br />A motion was made by Manager Melvin and seconded by Manager Miller to authorize <br />Moore Engineering, Inc. to work with the Secretary-Treasurer to submit an Application for <br />Surface Drain to the NDDWR regarding the Drain #62 relocation for the soybean <br />processing facility in Section 33 of Casselton Township. Upon roll call vote, the motion <br />carried unanimously. <br /> <br />Lynchburg-Buffalo Project No. 2016-01 <br />Jim Guler discussed various options to proceed with Lynchburg-Buffalo Project No. 2016- <br />01. The Board discussed the estimated costs of the various options. Mr. Guler noted <br />preliminary engineering would provide a more accurate estimate of the costs for Phases <br />IV and V of the project. <br /> <br />A motion was made by Manager Miller and seconded by Manager Melvin to authorize <br />Moore Engineering, Inc. to submit an Application for Cost-Share to the NDDWR regarding <br />preliminary engineering for Phases IV and V of Lynchburg-Buffalo Project No. 2016-01. <br />Upon roll call vote, the motion carried unanimously. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.