01-January 26, 2023 Planning Commission Meeting Packet
Laserfiche
>
Public
>
Planning Commission
>
2023
>
01-January 26, 2023 Planning Commission Meeting Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 2:50:44 PM
Creation date
2/2/2023 2:50:07 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
35
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Page 1 of 2 <br /> <br /> <br /> <br /> <br /> <br />Cass County Planning Commission Staff Report <br /> <br />Entitlements <br />Requested: <br />Minor Subdivision (1 Lot) of a part of the SW 1/4 of Section 4, Township 140 North, Range 54 West <br />Title: Brandon Hovland Subdivision Date: 12/16/2022 <br />Location: <br />SW 1/4 of Section 4, Township <br />140 North, Range 54 West (Buffalo Township) <br />Staff <br />Contact: Grace Puppe <br />Parcel Number: 28-0000-01815-000 Water <br />District: <br />Maple River Water <br />District <br />Owner(s)/Applicant: Brandon Hovland Engineer/ <br />Surveyor: Neset <br />Status: Planning Commission Hearing: January 26, 2023 <br />Existing Land Use Proposed Land Use <br />Agriculture Agriculture <br /> <br />Proposal <br /> <br />The applicant is seeking approval of a minor subdivision entitled Brandon Hovland Subdivision to plat a one (1) <br />Lot subdivision of approximately 12.55 acres. According to the applicant, the subdivision is requested to split the <br />existing farmstead from the rest of the quarter section. <br /> <br />The proposed ownership and maintenance responsibility of the subdivision will be private. The subdivision will <br />use an existing 31st St SE road access, ditches for storm sewer conveyance, rural water, and on-site septic systems <br />for wastewater treatment. <br />Agency Comments <br />County Engineer I reviewed this and do not have any comment from the County Engineer <br />perspective. <br />Water Resource District No comments were received prior to publishing the staff report. <br />Cass County Electric Cooperative No comments were received prior to publishing the staff report. <br />Century Link No comments were received prior to publishing the staff report. <br />Sprint No comments were received prior to publishing the staff report. <br />AT&T No comments were received prior to publishing the staff report. <br />Xcel Energy No comments were received prior to publishing the staff report. <br />Otter Tail Power Company No comments were received prior to publishing the staff report. <br />Magellan Pipeline Company No comments were received prior to publishing the staff report. <br />Agenda Item No. E.4
The URL can be used to link to this page
Your browser does not support the video tag.