Laserfiche WebLink
Page 1 of 2 <br /> <br /> <br /> <br /> <br /> <br />Cass County Planning Commission Staff Report <br /> <br />Entitlements <br />Requested: <br />Minor Subdivision (1 Lot) of a part of the NE ¼ of Section 2, Township 137 North, Range 49 West <br />Title: Sorby Subdivision Date: 10-12-2022 <br />Location: <br />NE ¼ of Section 2, Township <br />137 North, Range 49 West <br />(Pleasant Township) <br />Staff <br />Contact: Grace Puppe <br />Parcel Number: 57-0000-10230-010 Water <br />District: Southeast Water District <br />Owner(s)/Applicant: David & Lucille Sorby <br />Irrevocable Trust <br />Engineer/ <br />Surveyor: Moore Engineering <br />Status: Planning Commission Hearing: October 27, 2022 <br />Existing Land Use Proposed Land Use <br />Residential Residential <br /> <br />Proposal <br /> <br />The applicant is seeking approval of a minor subdivision entitled Sorby Subdivision to plat a one (1) Lot <br />subdivision of approximately 15.6 acres. According to the applicant, the subdivision is requested to split the land <br />between David & Lucy Sorby Irrevocable Trust and Gary and Diane Meyer. <br /> <br />The proposed ownership and maintenance responsibility of the subdivision will be private. The subdivision will <br />use an existing 174th Ave SE road access, ditches for storm sewer conveyance, rural water, and on-site septic <br />systems for wastewater treatment. <br /> <br />Agency Comments <br />County Engineer <br />Since this is an existing home site, I don’t have any issues. Any new construction <br />needs to be set back 450’ from the center of the Wild Rice River in accordance with <br />the MDZ/LDZ. <br />Water Resource District No comments. <br />Cass County Electric Cooperative No comments were received prior to publishing the staff report. <br />Century Link No comments were received prior to publishing the staff report. <br />Sprint Clear. <br />AT&T No comments were received prior to publishing the staff report. <br />Xcel Energy No comments were received prior to publishing the staff report. <br />Otter Tail Power Company No comments were received prior to publishing the staff report. <br />Magellan Pipeline Company No comments were received prior to publishing the staff report. <br />Agenda Item No. E.3