Laserfiche WebLink
4 <br /> <br />It was moved by Manager Thompson and seconded by Manager Lougheed to <br />recommend to the Elm River Joint Water Resource District that the Elm River Dam No. 3 <br />principal spillway pipe be replaced with a concrete pipe and lowered to an elevation <br />recommended by the Elm River Joint Water Resource District Engineer. Upon roll call <br />vote, the motion carried unanimously. <br /> <br />Legislative update <br />Mr. Fredricks briefly updated the Board on legislative items regarding water resource <br />districts. <br /> <br />Culvert replacement between Sections 13 and 18 in Bell Township <br />Discussion was held on a culvert replacement between Sections 13 and 18 in Bell <br />Township. The culvert was recently replaced however it does not appear to be draining <br />a significant amount of water. Blaine Laaveg indicated the previous culvert in that location <br />was full of debris and the replacement culvert was installed at the same elevation as the <br />previous culvert. Discussion was held on the drainage patterns in the area and it was <br />determined the culvert was installed properly. <br /> <br />Adjournment <br />There being no further business to be considered by the Board, it was moved by Manager <br />Thompson, seconded by Manager Lougheed and unanimously carried to adjourn the <br />meeting. <br /> <br /> APPROVED: <br /> <br /> <br /> <br /> ________________________________ <br /> Wes Ecker <br /> Chairman <br /> <br />ATTEST: <br /> <br /> <br /> <br />________________________________ <br />Carol Harbeke Lewis <br />Secretary-Treasurer