Laserfiche WebLink
Page 1 of 2 <br /> <br /> <br /> <br /> <br /> <br />Cass County Planning Commission Staff Report <br /> <br />Entitlements <br />Requested: <br />Minor Subdivision (1 Lot) of a part of the NW ¼ of Section 14, Township <br />139 North, Range 51 West <br />Title: Groucho’s Corner Subdivision Date: <br />Update: <br />09-09-2022 <br />09-26-2022 <br />Location: <br />NW ¼ of Section 14, <br />Township 139 North, Range <br />51 West (Durbin Township) <br />Staff <br />Contact: Grace Puppe <br />Parcel Number: 34-0000-03652-010; <br />34-0000-03652-020 <br />Water <br />District: <br />Maple River Water <br />District <br />Owner(s)/Applicant: Brenton Hartz Engineer/ <br />Surveyor: Houston Engineering <br />Status: Planning Commission Hearing: September 22, 2022 <br />County Commission Hearing: October 5, 2022 <br />Existing Land Use Proposed Land Use <br />Pasture Residential <br /> Proposal <br /> <br />The applicant is seeking approval of a minor subdivision entitled Groucho’s Corner Subdivision to plat a one (1) <br />Lot subdivision of approximately 17.89 acres. According to the applicant, the subdivision is requested to split the <br />existing pastureland off from the ag land and add it to the farmstead. <br /> <br />The proposed ownership and maintenance responsibility of the subdivision will be private. The subdivision will <br />use an existing 38th St SE road access, ditches for storm sewer conveyance, public water, and on-site septic systems <br />for wastewater treatment. <br /> <br />Agency Comments <br />County Engineer <br />This appears to be an existing farmstead with the buildings out of the 100 yr <br />floodplain. Ensure any new structures be constructed 2.35’ above the proposed <br />Western Cass FIS. <br />Water Resource District No comments. <br />Cass County Electric <br />Cooperative CCEC has an existing overhead line serving the existing farmstead. <br />Century Link No comments were received prior to publishing the staff report. <br />Sprint Sprint is clear on this location. <br />AT&T No comments were received prior to publishing the staff report. <br />Xcel Energy No comments were received prior to publishing the staff report.