Laserfiche WebLink
<br />3 <br /> <br />and the E 1/2 of Section 24 in Cornell Township, Cass County, North Dakota. The project <br />in Section 19 of Ayr Township will connect to the system in the E 1/2 of Section 24 in <br />Cornell Township via a pipeline under 138th Avenue SE. The project will include a single <br />pump outlet near the south boundary of the SE 1/4 of Section 24 in Cornell Township; the <br />pump will discharge directly into a natural drain. The project will include twelve surface <br />inlets. <br /> <br />According to County tax roll information supplied by Applicant, Brian Buhr owns the S 1/2 <br />of the NE 1/4 of Section 19 in Ayr Township; Brent Buhr owns the N 1/2 of the NE 1/4 of <br />Section 19 in Ayr Township; Arnold Buhr owns the NW 1/4 of Section 19 in Ayr Township; <br />Colleen Buhr owns the SW 1/4 of Section 19 in Ayr Township; Tammy Erickson owns the <br />SE 1/4 of Section 19 in Ayr Township; Brent Buhr owns the NE 1/4 of Section 24 in Cornell <br />Township; and Justin Killoran owns 146.11 acres in the SE 1/4 of Section 24 in Cornell <br />Township where Applicant intends to install the tile system. <br /> <br />Manager Miller moved, and Manager Melvin seconded the motion, to approve Application <br />to Install a Subsurface Water Management System No. 202213, filed July 12, 2022, for <br />Buhr Farms, Inc., regarding a proposed tile system in all of Section 19 in Ayr Township <br />and the E 1/2 of Section 24 in Cornell Township; and to authorize the Secretary-Treasurer <br />to sign Subsurface Water Management Permit No. 202213, subject to the following <br />conditions: <br /> <br />1. Applicant will install and maintain erosion protection at any and all outlets <br />into the natural drain in the SE 1/4 of Section 24 in Cornell Township. <br /> <br />2. Applicant will re-establish any areas disturbed installing or maintaining <br />Applicant’s tile system. <br /> <br />3. Applicant must turn off any pump outlets and otherwise close all outlets <br />during “critical flood periods,” as determined by the Maple River Water <br />Resource District. <br /> <br />4. Applicant will not install Applicant’s tile system within 20 feet, on either side, <br />of any rural water lines Cass Rural Water Users District has in the E 1/2 of <br />Section 24 in Cornell Township or in Section 19 of Ayr Township under any <br />blanket easements, or otherwise beyond the Water District’s existing <br />easement(s). <br /> <br />5. Applicant must apply for an amendment to Subsurface Water Management <br />Permit No. 202213 in advance of any proposed alterations to outlet <br />locations, the addition of any outlets, or improvements or modifications to <br />the tile system that could increase the capacity or drainage area of the tile <br />system. <br /> <br />Upon roll call vote, the motion carried unanimously. <br />