2022-07-11
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2022
>
2022-07-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:02:46 PM
Creation date
8/9/2022 2:02:46 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />3 <br /> <br />A motion was made by Manager Melvin and seconded by Manager Miller to authorize <br />Moore Engineering, Inc. to hire a contractor to complete repairs at the following sites: <br />• Cass-Richland Drain #1 Sites #8, #9 <br />• Coburn Township Drain #2 Sites #1, #3, #4, #6 <br />• Drain #14 Site #3 <br />• Drain #15 Site #22 <br />• Drain #37 Site #14 <br />• Drain #39 Sites #3, #10, #13, #14, #15, #17, #18, #19, #20, #24 <br />• Drain #46 Site #14 <br />• Drain #54 Sites #1, #3, #6, #8 <br />• Drain #56 Sites #1, #10, #11, #13, #14 <br />• Drain #58 Sites #3, #4, #8 <br />• Drain #59 Sites #4, #6, #7, #8, #9, #10 <br />• Drain #62 Sites #1, #3, #4, #5 <br />• Swan Creek Diversion Sites #2, #3 <br />Upon roll call vote, the motion carried unanimously. <br /> <br />Mr. Woodard noted dam inspections will likely be completed within approximately one <br />month. <br /> <br />Adjournment <br />There being no further business for the Board to consider, it was moved by Manager <br />Miller, seconded by Manager Melvin and unanimously carried to adjourn the meeting. <br /> <br />APPROVED: <br /> <br /> <br /> <br />_______________________________ <br />Rodger Olson <br />Chairman <br /> <br />ATTEST: <br /> <br /> <br /> <br />________________________________ <br />Carol Harbeke Lewis <br />Secretary-Treasurer
The URL can be used to link to this page
Your browser does not support the video tag.