2022-07-07
Laserfiche
>
Public
>
Water Resource Districts
>
Maple River
>
Minutes
>
2022
>
2022-07-07
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/9/2022 2:02:44 PM
Creation date
8/9/2022 2:02:43 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
<br />6 <br /> <br />1. Applicants will install and maintain erosion protection or other ditch <br />stabilization materials at any and all outlets into Normanna Township’s road <br />right of way. <br /> <br />2. Applicants will re-establish any areas disturbed installing or maintaining <br />Applicants’ tile system. <br /> <br />3. Applicants must turn off any pump outlets and otherwise close all outlets <br />during “critical flood periods,” as determined by the Maple River Water <br />Resource District. <br /> <br />4. Applicants will remove silt or vegetation, or repair erosion or scour damages <br />directly caused by Applicants’ tile system, but only up to one mile <br />downstream from the project outlet. <br /> <br />5. Applicants will not install Applicants’ tile system within 20 feet, on either <br />side, of any rural water lines Cass Rural Water Users District has in the N <br />1/2 of Section 31 in Normanna Township, under any blanket easements, or <br />otherwise beyond the Water Users District’s existing easement(s). <br /> <br />6. Applicants must apply for an amendment to Subsurface Water <br />Management Permit No. 20229 in advance of any proposed alterations to <br />outlet locations, the addition of any outlets, or improvements or <br />modifications to the tile system that could increase the capacity or drainage <br />area of the tile system. <br /> <br />Upon roll call vote, the motion carried unanimously. <br /> <br />With regard to condition #4, Applicants’ obligations to remove silt or vegetation, or to <br />repair erosion or scour damages, will only arise upon submission of substantial evidence <br />to the Board by a downstream landowner or road authority that Applicants’ tile system <br />directly caused accumulation of silt or vegetation, erosion, or scouring. <br /> <br />Under Section 61-32-03.1, the Board cannot attach any additional conditions to <br />Applicants’ permit. However, for Applicants’ protection, and to ensure protection of <br />Applicants’ tile system, the Board will recommend that Applicants comply with the <br />following: <br /> <br />1. The Board recommends that Applicants obtain written consent from the <br />Normanna Township Board of Township Supervisors to discharge into, or <br />otherwise utilize, any of the Township’s ditches or road right of way. <br /> <br />2. The Board recommends that Applicants obtain all other necessary and <br />requisite licenses, permits, registrations, and/or approvals from all <br />applicable federal, state, county, and municipal governments, and any other <br />applicable governmental entities.
The URL can be used to link to this page
Your browser does not support the video tag.